Laserfiche WebLink
Mitigation Measure 4.0-lb: To reduce daytime noise impacts due to construction <br /> within the EDZ area, all project developers shall require construction contractors <br /> working within 55 feet of the construction site property boundary to implement <br /> the following measures: <br /> • Equipment and trucks used for construction shall use the best available <br /> noise control techniques (e.g., improved mufflers, equipment redesign, use <br /> of intake silencers, ducts, engine enclosures, and acoustically-attenuating <br /> shields or shrouds). <br /> • Impact tools (e.g.,jack hammers, pavement breakers, and rock drills)used <br /> for construction shall be hydraulically or electrically powered where <br /> feasible to avoid noise associated with compressed air exhaust from <br /> pneumatically powered tools. Where use of pneumatic tools is <br /> unavoidable, an exhaust muffler on the compressed air exhaust shall be <br /> used; this muffler can lower noise levels from the exhaust by up to about <br /> 10 dBA. External jackets on the tools themselves shall be used where <br /> feasible; this could achieve a reduction of 5 dBA. Quieter procedures, <br /> such as use of drills rather than impact tools, shall be used unless deemed <br /> not feasible by a geotechnical investigation. <br /> Site(s)affected: All sites within the Project. <br /> (Draft SEIR, pp. 4.0-13 to 4.0-14.) <br /> Impact 4.0-7 <br /> Development within the area of the Project would be exposed to stationary (non- <br /> transportation) noise sources at levels in excess of the City of Pleasanton Noise Standards. <br /> The Revised Final SEIR evaluates the impact of the Project related to the exposure to <br /> stationary (non-transportation)noise sources that would exceed the applicable City of Pleasanton <br /> Noise Standards. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the Project that would avoid the <br /> significant environmental effect as identified in the Revised Final SEIR. <br /> Mitigation Measures 4.0-lc and 4.0-1d, which are incorporated into the Project, <br /> will reduce the significant environmental impact to a less than significant level. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 15 <br />