The Revised Final SEIR evaluates the impact of the Project related to a substantial <br /> temporary increase in noise levels at sensitive receptors located near construction sites. <br /> Significance Be ore Mitigation: Significant <br /> f g g <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the Project that would avoid the <br /> significant environmental effect as identified in the Revised Final SEIR. <br /> Mitigation Measures 4.0-la and 4.0-lb, which are incorporated into the Project, <br /> will reduce the significant environmental impact to a less than significant level. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Construction activities would include demolition, site preparation, paving, <br /> and building construction, in addition to construction for improvements <br /> such as roadways, storm drainage, and utilities. Construction would <br /> involve the use of heavy equipment(e.g., front loader, graders, haul <br /> trucks) in addition to small power tools, generators, and hand tools that <br /> would be sources of noise. <br /> 2. Implementation of Mitigation Measures 4.0-la and 4.0-lb set forth in <br /> Table 5-1 of the Final SEIR and listed in the MMRP apply to all potential <br /> sites that would be developed within the Project and will ensure that <br /> Impact 4.0-1 will be reduced to a less than significant level, and are <br /> hereby incorporated by reference and described below. <br /> Mitigation Measure 4.C-la: To address nuisance impacts of construction activities <br /> within the EDZ area, all developers of sites within the EDZ area shall ensure that <br /> construction contractors implement the following: <br /> • Signs shall be posted at all construction site entrances to the property upon <br /> commencement of construction, for the purposes of informing all <br /> contractors/subcontractors,their employees, agents, material haulers, and <br /> all other persons at the applicable construction sites, of the basic <br /> requirements of Mitigation Measures 4.0-la and 4.0-lb. <br /> • Signs shall be posted at the construction sites that include permitted <br /> construction days and hours, a day and evening contact number for the job <br /> site, and a contact number in the event of problems. <br /> • An onsite complaint and enforcement manager shall respond to and track <br /> complaints and questions related to noise. <br /> Site(s)affected: All sites within the Project. <br /> 14 <br />