My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:28:08 PM
Creation date
1/28/2020 4:28:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
Document Relationships
11 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENT 5A
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENTS 6-9
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Construction activities within the Project- specifically, reconstruction and <br /> widening of the freeway on-ramp bridge over the Alamo Canal - could <br /> affect wetlands and wetland habitat. <br /> 2. Implementation of Mitigation Measures 4.E-2 through 4.E-4 set forth in <br /> Table 5-1 of the Final SEIR and listed in the RMMRP will ensure that <br /> Impact 4.E-lc will be reduced to a less than significant level and are <br /> hereby incorporated by reference and described below. <br /> Mitigation Measure 4.E-2: Wetland Delineation. In coordination with the City, a <br /> qualified wetland ecologist shall conduct a wetland delineation of the proposed <br /> bridge expansion and replacement site to identify potential waters of the United <br /> States (U.S.) (including wetlands) or waters of the state which may be present. If <br /> no waters of the U.S. or waters of the state are identified onsite, no further action <br /> is required. Should waters of the U.S. or waters of the state be determined present <br /> within the site, features shall be mapped and documented in a report for <br /> submission to the appropriate jurisdictional agencies retaining authority over the <br /> identified features. <br /> Site(s)affected: Proposed bridge expansion and replacement site. <br /> Mitigation Measure 4.E-3: Wetland Avoidance and Protection. Access roads, <br /> work areas,and infrastructure shall be sited to avoid and minimize direct and <br /> indirect impacts to wetlands and waters. Where work will occur within and/or <br /> adjacent to federal and state jurisdictional wetlands and waters, protection <br /> measures shall be applied to minimize the footprint of overall impacts and protect <br /> these features. These measures shall include the following: <br /> • A protective barrier(such as silt fencing) shall be erected around the work <br /> area(s)to minimize disturbance to wetland or water features and isolate <br /> adjacent to wetland or water features from construction activities to reduce <br /> the potential for incidental fill, erosion, or other disturbance beyond what <br /> is necessary for bridge expansion and replacement; <br /> • Signage shall be installed on the fencing to identify sensitive habitat areas <br /> and restrict construction activities; <br /> • No equipment mobilization, grading, clearing, or storage of equipment or <br /> machinery, or similar activity shall occur at the site until a representative <br /> of the City has inspected and approved the wetland protection fencing; and <br /> • The City shall ensure that the temporary fencing is continuously <br /> maintained until all construction activities are completed. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.