Laserfiche WebLink
structures with active roosts shall be removed only when no rain is <br /> occurring or is forecast to occur for 3 days and when daytime temperatures <br /> are at least 50°F. <br /> • Removal of trees with potential bat roosting habitat or active bat roost <br /> sites shall follow a two-step removal process: <br /> 1. On the first day of tree removal and under supervision of the <br /> qualified biologist, branches and limbs not containing cavities or <br /> fissures in which bats could roost, shall be cut only using <br /> chainsaws. <br /> 2. On the following day and under the supervision of the qualified <br /> biologist, the remainder of the tree may be removed, either using <br /> chainsaws or other equipment(e.g. excavator or backhoe). <br /> Removal of structures containing or suspected to contain potential bat roosting <br /> habitat or active bat roosts shall be dismantled under the supervision of the <br /> qualified biologist in the evening and after bats have emerged from the roost to <br /> forage. Structures shall be partially dismantled to significantly change the roost <br /> conditions, causing bats to abandon and not return to the roost. <br /> Site(s)affected: All sites where buildings shall be demolished or large trees <br /> constituting suitable habitat for roosting bats shall be removed. <br /> (Draft SEIR,pp. 4.E-9 to 4.E-14.) <br /> Impact 4.E-lc <br /> Development facilitated by the Project could potentially have a substantial adverse effect <br /> on federally protected wetlands. <br /> The Revised Final SEIR evaluates the impact of the Project on wetlands, including <br /> wetlands present in the Alamo Canal adjacent to the area of the Project. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the Project that would avoid the <br /> significant environmental effect as identified in the Revised Final SEIR. <br /> Mitigation Measures 4.E-2 through 4.E-4, which have been incorporated into the <br /> Project, will reduce the significant environmental impact to a less than significant <br /> level. <br /> 22 <br />