My WebLink
|
Help
|
About
|
Sign Out
4_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
11-08_SPECIAL
>
4_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 3:02:51 PM
Creation date
11/1/2023 3:01:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/8/2023
DESTRUCT DATE
15Y
Document Relationships
4
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
4_Exhibit A
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D <br />TRAFFIC MITIGATION IMPROVEMENTS <br />A. Foothill Road/Canvon Wav/Dublin Canvon Road <br />1. Widen canyon Way between stoneridge Mall Road <br />and Foothill Road to provide one additional <br />westbound lane. This will provide a total of <br />three westbound lanes. Widen both the north <br />and south sides of canyon way and reconstruct <br />the existing median narrowing it by four feet <br />to a width of twelve feet. The south curb <br />will be moved six feet. The purpose is to <br />improve existing traffic flow and mitigate <br />the impact of new development by extending a <br />very short existing right-turn lane for <br />westbound traffic destined for the Foothill <br />Road interchange. <br />2. Add a fourth northbound lane on Foothill Road <br />between Deodar Way and the northbound to <br />eastbound ramp at the Foothill Road <br />interchange with I-580. This will provide <br />two northbound lanes on Foothill Road to the <br />ramp toward eastbound I-580. The two lanes <br />would transition to one lane prior to the <br />collector-distributor road. The other two <br />lanes would serve the existing two lanes <br />toward the over-crossing at I-580. Foothill <br />Road between Deodar Way and Canyon Way can be <br />restriped between the existing curbs. <br />Foothill Road between canyon Way and the <br />northbound to eastbound ramp will require <br />wideninq Foothill Road and movinq the <br />existing sidewalk back within the existinq <br />right-of-way. An additional lane will be <br />constructed next to the existing one-lane <br />northbound to eastbound ramp which will <br />require Caltrans approval. The purpose of <br />this improvement is to provide additional <br />capacity for the northbound through movement <br />and to more evenly distribute traffic across <br />the lanes, thereby reducinq the amount of <br />green time needed for the northbound <br />movement. <br />BXHIBIT D <br />Page 1 of 3 <br />93103418
The URL can be used to link to this page
Your browser does not support the video tag.