My WebLink
|
Help
|
About
|
Sign Out
3_Exhibits A-G
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2022
>
12-14
>
3_Exhibits A-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2022 2:54:28 PM
Creation date
12/7/2022 2:52:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/14/2022
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2022\12-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mike Tassano December 6, 2022 <br />Page 2 of 39 <br />7. Springdale Avenue/Stoneridge Drive <br />8. Stoneridge Drive/Stoneridge Mall Road <br />9. Stoneridge Drive/I-680 SB Ramps <br />10. Stoneridge Drive/I-680 NB Ramps <br />11. Hopyard Road/Stoneridge Drive <br />12. Hacienda Drive/Stoneridge Drive <br />13. Santa Rita Road/Stoneridge Drive <br />14. Hopyard Road/I-580 WB Ramps <br />15. Hopyard Road/I-580 EB Ramps <br />16. Hopyard Road/Owens Drive <br />17. Hacienda Drive/I-580 WB Ramps <br />18. Hacienda Drive/I-580 EB Ramps <br />19. Hacienda Drive/Owens Drive <br />20. Tassajara Road/I-580 WB Ramps <br />21. Santa Rita Road/I-580 EB Ramps/Pimlico Drive <br />22. Santa Rita Road/Rosewood Drive <br />23. Santa Rita Road/Old Santa Rita Road/Pickens Lane <br />24. Santa Rita Road/Valley Avenue <br />25. Old Santa Rita Road/Rosewood Drive <br />26. Valley Avenue/Busch Road <br />27. Bernal Avenue/Valley Avenue/Stanley Boulevard <br />28. Stanley Boulevard/El Charro Road <br />29. Sunol Boulevard/First Street/Bernal Avenue <br />30. Sunol Boulevard/Valley Avenue/Junipero Street <br />31. Sunol Boulevard/I-680 NB Ramps <br />32. Sunol Boulevard/I-680 SB Ramps <br />Operations of signalized intersections were evaluated using the methodology of the <br />Transportation Research Board’s Highway Capacity Manual 2000 Edition. The following scenarios <br />were evaluated: <br />• Existing Conditions – Existing volumes obtained from traffic counts and the existing <br />roadway system configuration. Existing peak hour counts were collected during the <br />weekday morning (7:00 to 9:00 AM) and weekday evening (4:00 to 6:00 PM) peak periods <br />when local schools were in session. <br />• Existing Conditions Plus Project – Existing volumes obtained from traffic counts and the <br />existing roadway system configuration plus traffic that would be generated by the <br />development of the housing element update sites/projects. Under this scenario, the <br />proposed housing element land uses are added to the baseline travel demand model, <br />replacing current uses if applicable, to estimate traffic volume changes at the study
The URL can be used to link to this page
Your browser does not support the video tag.