Laserfiche WebLink
Mike Tassano December 6, 2022 <br />Page 2 of 39 <br />7. Springdale Avenue/Stoneridge Drive <br />8. Stoneridge Drive/Stoneridge Mall Road <br />9. Stoneridge Drive/I-680 SB Ramps <br />10. Stoneridge Drive/I-680 NB Ramps <br />11. Hopyard Road/Stoneridge Drive <br />12. Hacienda Drive/Stoneridge Drive <br />13. Santa Rita Road/Stoneridge Drive <br />14. Hopyard Road/I-580 WB Ramps <br />15. Hopyard Road/I-580 EB Ramps <br />16. Hopyard Road/Owens Drive <br />17. Hacienda Drive/I-580 WB Ramps <br />18. Hacienda Drive/I-580 EB Ramps <br />19. Hacienda Drive/Owens Drive <br />20. Tassajara Road/I-580 WB Ramps <br />21. Santa Rita Road/I-580 EB Ramps/Pimlico Drive <br />22. Santa Rita Road/Rosewood Drive <br />23. Santa Rita Road/Old Santa Rita Road/Pickens Lane <br />24. Santa Rita Road/Valley Avenue <br />25. Old Santa Rita Road/Rosewood Drive <br />26. Valley Avenue/Busch Road <br />27. Bernal Avenue/Valley Avenue/Stanley Boulevard <br />28. Stanley Boulevard/El Charro Road <br />29. Sunol Boulevard/First Street/Bernal Avenue <br />30. Sunol Boulevard/Valley Avenue/Junipero Street <br />31. Sunol Boulevard/I-680 NB Ramps <br />32. Sunol Boulevard/I-680 SB Ramps <br />Operations of signalized intersections were evaluated using the methodology of the <br />Transportation Research Board’s Highway Capacity Manual 2000 Edition. The following scenarios <br />were evaluated: <br />• Existing Conditions – Existing volumes obtained from traffic counts and the existing <br />roadway system configuration. Existing peak hour counts were collected during the <br />weekday morning (7:00 to 9:00 AM) and weekday evening (4:00 to 6:00 PM) peak periods <br />when local schools were in session. <br />• Existing Conditions Plus Project – Existing volumes obtained from traffic counts and the <br />existing roadway system configuration plus traffic that would be generated by the <br />development of the housing element update sites/projects. Under this scenario, the <br />proposed housing element land uses are added to the baseline travel demand model, <br />replacing current uses if applicable, to estimate traffic volume changes at the study