My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 3
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
081721
>
04 ATTACHMENT 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:18:47 PM
Creation date
8/12/2021 4:03:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/17/2021
DESTRUCT DATE
15Y
Document Relationships
04
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\081721
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2: <br />Proposed Site Plan <br />Vaulted Gym (two-story <br />AH <br />DEVELOPMENT <br />GROUP <br />In addition to the on-site access and circulation the applicant is proposing to: 1) construct a six- <br />foot -wide bicycle lane along its frontage on Dublin Canyon Road; 2) construct a five -foot -wide <br />sidewalk/path on the north side of Dublin Canyon Road; 3) construct an eastbound turn pocket <br />on Dublin Canyon Road to access the project; 4) construct a westbound deceleration lane into <br />the project; 5) construct curbs and gutters on the north side of Dublin Canyon Road; and 6) <br />underground all utilities along the property frontage on the north side of Dublin Canyon Road. <br />Architecture <br />As proposed, the multi-purpose building is designed with a relatively simple palette of materials <br />to include cement plaster with stone accents, window trims, and tile roofing. The main focus of <br />the site will be centered around the church building which includes more finely detailed <br />finishes, entry, and a distinctive copper -roofed dome. <br />The proposed multi-purpose building has been designed with varying roof heights with a <br />single -story, approximately 17 foot tall portion of the building fronting along Dublin Canyon <br />Road that would include the projects kitchen and storage areas. The front elevation will include <br />stone gable end pop -outs that will break up the long elevation and enhance the rural character <br />of the building. Setback approximately 60 from the face of the building as shown in Figure 2, <br />the vaulted gym portion of the building will increase in height to a maximum 30 feet tall, <br />PUD -114-01 M, 11300 Dublin Canyon Road Planning Commission <br />6of15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.