My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 3
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
081721
>
04 ATTACHMENT 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:18:47 PM
Creation date
8/12/2021 4:03:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/17/2021
DESTRUCT DATE
15Y
Document Relationships
04
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\081721
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Is there additional information needed to assist the Commission in its decision on the <br />proposal? <br />Commissioners requested additional information as described in questions 3 and 4(b). In <br />addition, Commissioner Allen requested staff and the applicant review the pedestrian level <br />street renderings to verify they accurately reflect the screening that will occur with the <br />proposed landscaping. <br />Following the work session, the applicant submitted revised plans that included reducing the <br />height of the community building to a maximum 30 feet in height. In addition, the new plan set <br />includes additional rendering views to demonstrate the parking will be adequately screened <br />from view along Dublin Canyon Road. <br />AREA AND SITE DESCRIPTION <br />The approximately 16.2 -acre Pleasant View Church of Christ property (project site) is located <br />at 11300 Dublin Canyon Road. The existing church is located at the top of the hill on the <br />property, in the northernmost portion of the site. The property is also bisected by Dublin Creek, <br />which extends west to east, roughly parallel to Dublin Canyon Road. <br />From a high point of approximately 480 feet in elevation where the church building is located, <br />the property drops steeply down towards the creek and flattens out along Dublin Canyon Road <br />at approximately 420 feet in elevation. The 4.3 -acre portion of the site proposed to be <br />developed with the new Greek Orthodox church, shown in Figure 1, is located south of the <br />existing creek and north of Dublin Canyon Road, in an area that includes a well but is currently <br />vacant. <br />Beyond the improvements noted above, the majority of the site is undeveloped, with <br />predominantly ruderal/non-native grasslands and mixed oak/bay woodland along the creek. <br />PUD -114-01 M, 11300 Dublin Canyon Road Planning Commission <br />4of15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.