working days remained the same as those provided by the applicant in Table 1. See Table 2  <br />for the adjusted construction schedule.  <br />Table  2: Adjusted Construction Schedule  <br />Construction Activity Phase Start Date Phase End Date Working  Days per Week Total  Number of Working  Days  <br />Project Phase 1  <br />Site Preparation 01/18/2021 04/01/2021 5 54  <br />Demolition 04/02/2021 04/29/2021 5 20  <br />Grading 04/30/2021 06/30/2021 5 44  <br />Building Construction 07/01/2021 11/08/2021 5 93  <br />Paving 07/26/2021 09/03/2021 5 30  <br />Architectural Coating 07/26/2021 11/08/2021 5 76  <br />Project Phase 2  <br />Demolition 11/09/2021 12/10/2021 5 24  <br />Building Construction 12/11/2021 05/13/2022 5 110  <br />Paving 01/10/2022 02/25/2022 5 35  <br />Architectural Coating 01/10/2022 05/13/2022 5 90  <br />Project Phase 3  <br />Building Construction 05/16/2022 07/04/2022 5 36  <br />Paving 05/25/2022 06/08/2022 5 11  <br />Architectural Coating 05/25/2022 07/04/2022 5 29  <br />  <br />Note 4. The construction equipment list was adjusted in CalEEMod to reflect Applicant‐provided  <br />information, dated October 22, 2020, and revised January 6, 2021, as illustrated below in  <br />Table 3.   <br />Table  3: Anticipated Construction Equipment List  <br />Activity Equipment Amount  <br />Hours  <br />per Day  <br />  <br />Horsepower  <br />Load  <br />Factor  <br />Demolition Sweepers/Scrubbers 1 4 64 0.46  <br />Other Construction Equipment 4 8 172 0.42  <br />Off‐Highway Trucks 8 8 402 0.38  <br />Site Preparation  <br />  <br />Sweepers/Scrubbers 1 4 263 0.30  <br />Trenchers 2 8 78 0.50  <br />Excavators 2 8 158 0.38  <br />Grading Sweepers/Scrubbers 1 4 64 0.46  <br />Graders 2 8 187 0.41  <br />Scrapers 2 8 367 0.48  <br />Appendix A Page 10