My WebLink
|
Help
|
About
|
Sign Out
20 Attachment 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
061521
>
20 Attachment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2021 4:43:16 PM
Creation date
6/8/2021 4:29:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
15Y
Document Relationships
20
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\061521
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building <br />Construction <br />Sweepers/Scrubbers 1 4 64 0.46 <br />Welders 4 8 46 0.45 <br />Aerial Lifts 2 8 63 0.31 <br />Cranes 1 4 231 0.29 <br />Cement and Mortar Mixers 1 2 9 0.56 <br />Paving Sweepers/Scrubbers 1 4 64 0.46 <br />Cement and Mortar Mixers 1 2 9 0.56 <br />Pavers 1 8 130 0.42 <br />Rollers 1 8 80 0.38 <br />Architectural <br />Coating <br />Cranes 1 8 231 0.29 <br />Aerial Lifts 2 2 63 0.31 <br />Forklifts 1 4 89 0.20 <br /> <br />Note 5. According to Applicantāprovided information, dated October 22, 2020, revised January 6, <br />2021, the proposed project would involve the removal of approximately 200 cubic yards of <br />vegetation during site preparation activities and the exportation of approximately 1,500 <br />cubic yards of cut soil during grading activities. <br />Note 6. According to Applicantāprovided information, dated October 22, 2020, and revised January <br />6, 2021, the proposed project would involve the removal of an estimated 163,500 square <br />feet of existing building space during Phase 1 and an estimated 240,000 square feet of <br />pavement during Phase 2. As calculated in the Hauling Calculations sheet contained in this <br />Appendix, the building demolition would generate an estimated 7,521 tons of debris during <br />Phase 1 and the pavement demolition would generate an estimated 9,000 tons of debris <br />during Phase 2. See the Hauling Calculations sheet contained in this Appendix for more <br />information. <br />Note 7. During the proposed project construction model, all operational emission sources were <br />reduced to zero to separate modeled construction emissions from operational emission <br />results. During the proposed project and existing operational models, all construction <br />emission sources were reduced to zero to separate modeled construction and operational <br />emission results. <br />Note 8. BAAQMD Basic Construction Mitigation Measures Recommended For All Proposed Projects <br />was applied to this project. This includes watering exposed areas at minimum twice per day <br />and limiting construction vehicle speeds to 15 miles per hour on unpaved roads. <br />Note 9. Based on draft traffic volume data for the proposed project provided by the City of <br />Pleasanton via email on January 5, 2021, the proposed project would generate an estimated <br />4,520 new vehicle trips daily. The draft traffic volumes show that, upon full project buildout, <br />the 735 employees to occupy the proposed office space would generate an estimated 2,410 <br />daily vehicle trips, the 640 employees to occupy the proposed production laboratory space <br />would generate an estimated 2,110 daily vehicle trips, and the 40 employees to occupy the <br />Appendix A Page 11
The URL can be used to link to this page
Your browser does not support the video tag.