Laserfiche WebLink
Building  <br />Construction  <br />Sweepers/Scrubbers 1 4 64 0.46  <br />Welders 4 8 46 0.45  <br />Aerial Lifts 2 8 63 0.31  <br />Cranes 1 4 231 0.29  <br />Cement and Mortar Mixers 1 2 9 0.56  <br />Paving Sweepers/Scrubbers 1 4 64 0.46  <br />Cement and Mortar Mixers 1 2 9 0.56  <br />Pavers 1 8 130 0.42  <br />Rollers 1 8 80 0.38  <br />Architectural  <br />Coating  <br />Cranes 1 8 231 0.29  <br />Aerial Lifts 2 2 63 0.31  <br />Forklifts 1 4 89 0.20  <br />  <br />Note 5. According to Applicantā€provided information, dated October 22, 2020, revised January 6,  <br />2021, the proposed project would involve the removal of approximately 200 cubic yards of  <br />vegetation during site preparation activities and the exportation of approximately 1,500  <br />cubic yards of cut soil during grading activities.  <br />Note 6. According to Applicantā€provided information, dated October 22, 2020, and revised January  <br />6, 2021, the proposed project would involve the removal of an estimated 163,500 square  <br />feet of existing building space during Phase 1 and an estimated 240,000 square feet of  <br />pavement during Phase 2. As calculated in the Hauling Calculations sheet contained in this  <br />Appendix, the building demolition would generate an estimated 7,521 tons of debris during  <br />Phase 1 and the pavement demolition would generate an estimated 9,000 tons of debris  <br />during Phase 2. See the Hauling Calculations sheet contained in this Appendix for more  <br />information.  <br />Note 7.  During the proposed project construction model, all operational emission sources were  <br />reduced to zero to separate modeled construction emissions from operational emission  <br />results. During the proposed project and existing operational models, all construction  <br />emission sources were reduced to zero to separate modeled construction and operational  <br />emission results.  <br />Note 8. BAAQMD Basic Construction Mitigation Measures Recommended For All Proposed Projects  <br />was applied to this project. This includes watering exposed areas at minimum twice per day  <br />and limiting construction vehicle speeds to 15 miles per hour on unpaved roads.  <br />Note 9. Based on draft traffic volume data for the proposed project provided by the City of  <br />Pleasanton via email on January 5, 2021, the proposed project would generate an estimated  <br />4,520 new vehicle trips daily. The draft traffic volumes show that, upon full project buildout,  <br />the 735 employees to occupy the proposed office space would generate an estimated 2,410  <br />daily vehicle trips, the 640 employees to occupy the proposed production laboratory space  <br />would generate an estimated 2,110 daily vehicle trips, and the 40 employees to occupy the  <br />Appendix A Page 11