Phase Phase Start Date Phase End Date Working  Days per Week Total  Number of Working  Days  <br />Demolition 04/01/2021 06/01/2021 5 44  <br />Grading 06/01/2021 08/01/2021 5 44  <br />Building Construction 08/01/2021 07/01/2022 5 239  <br />Paving 10/01/2021 01/15/2022 5 76  <br />Architectural Coating 10/01/2021 07/01/2022 5 195  <br />  <br /> As the proposed project would occur over three separate phases, the anticipated  <br />construction schedule displayed in Table 1 was adjusted to accommodate the phased nature  <br />of the proposed project. As the entire project site would be prepared for construction (i.e.,  <br />vegetation removal) and graded in Phase 1 of the project, the schedule for those  <br />construction activities would occur in their entirety during Phase 1 of the project and remain  <br />unchanged.  <br /> Demolition activities would occur over 44 total working days, as displayed in Table 1;  <br />however, demolition activities would involve the removal of an estimated 163,500 square  <br />feet of existing building space during Phase 1 and an estimated 240,000 square feet of  <br />pavement during Phase 2. As calculated in the Hauling Calculations sheet contained in this  <br />Appendix, the building demolition would generate an estimated 7,521 tons of debris, or  <br />approximately 46 percent of the total demolition debris generated, and the pavement  <br />demolition would generate an estimated 9,000 tons of debris, or approximately 54 percent  <br />of the total demolition debris generated. In the absence of a detailed schedule of when  <br />Phase 1 demolition activities and Phase 2 demolition activities would occur, it was assumed  <br />that approximately 46 percent of demolition activities would occur during Phase 1 and  <br />approximately 54 percent of demolition activities would occur during Phase 2 of the  <br />proposed project.  <br /> For paving, building construction, and architectural coating activities, the schedules were  <br />adjusted so that these activities would occur within each project phase and the duration of  <br />which would reflect that project phase’s proportion of the total proposed square footage of  <br />development. When accounting for all proposed land uses, Phase 1 would involve the  <br />development of a total 390,000 square feet of office, warehouse, distribution, packaging,  <br />production laboratories, and parking space, or approximately 39 percent of the total  <br />proposed development; Phase 2 would involve the development of a total 469,270 square  <br />feet of office, production laboratories, and parking space, or approximately 46 percent of  <br />the total proposed development; and Phase 3 would involve the development of a total  <br />152,062 square feet of office, production laboratories, and parking space, or approximately  <br />15 percent of the total proposed development. Consistent with the anticipated construction  <br />schedule provided by the applicant, paving and architectural coating activity schedules were  <br />adjusted to start concurrently in each construction phase and the architectural coating  <br />activity scheduled was adjusted to end the same day as building construction activities in  <br />each construction phase. In all adjusted construction activity schedules, the total number of  <br />Appendix A Page 9