Laserfiche WebLink
   <br />  <br /> Construction Phase 3  <br /> Commercial > General Office Building > 63.83 x 1000sqft = Proposed 63,834 square feet of  <br />office space included in Phase 3 of the proposed project.  <br /> Commercial > Research & Development > 52.23 x 1000sqft = Proposed 52,228 square feet of  <br />production laboratory space included in Phase 3 of the proposed project.  <br /> Parking > Parking Lot > 90 x Space = Proposed 90 surface parking spaces included in Phase 3  <br />of the proposed project.  <br /> Proposed Project Operation  <br /> Commercial > General Office Building > 207.08 x 1000sqft = Proposed 207,084 gross square  <br />feet of office space included in the proposed project.  <br /> Industrial > Unrefrigerated Warehouse‐No Rail > 20 x 1000sqft = Proposed 20,000 square  <br />feet of warehouse, packaging, and distribution space included in Phase 1 of the proposed  <br />project.  <br /> Commercial > Research & Development > 153,98 x 1000sqft = Proposed 153,978 gross  <br />square feet of production laboratory space included in the proposed project.  <br /> Parking > Unenclosed Parking Structure with Elevator > 1,168 x Space = Proposed 354,000  <br />square feet of parking structure space included in Phase 2 of the proposed project. Because  <br />the inclusion of an elevator with the parking structure was unknown at the time of this  <br />assessment, the parking structure was conservatively assumed to contain an elevator.  <br /> Parking > Parking Lot > 90 x Space = Proposed 90 surface parking spaces included in Phase 3  <br />of the proposed project.  <br /> Existing Land Uses Operation  <br /> Retail > Regional Shopping Center > 163.5 x 1000sqft = Existing 163,500 gross square feet of  <br />retail shopping space currently occupying the project site.  <br /> Parking > Parking Lot > 340 x 1000sqft = Existing 340,000 square feet of parking lot currently  <br />occupying the project site.  <br />Note 3. According to Applicant‐provided information, dated October 22, 2020, and revised January  <br />6, 2021, project construction is anticipated to occur from January 15, 2021, through July 1,  <br />2022. The anticipated construction schedule provided in the Applicant‐provided information  <br />is illustrated below in Table 1.   <br />Table  1: Anticipated Construction Schedule  <br />Phase Phase Start Date Phase End Date Working  Days per Week Total  Number of Working  Days  <br />Site Preparation 01/15/2021 04/01/2021 5 54  <br />Appendix A Page 8