My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:28:08 PM
Creation date
1/28/2020 4:28:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
Document Relationships
11 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENT 5A
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENTS 6-9
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site(s)affected: All sites within the Project(Phase I and Full Buildout). <br /> Mitigation Measure 4.D-4: Retention of Bicycle Lanes on Stoneridge Drive. Final <br /> design of all improvements along Stoneridge Drive shall maintain or enhance <br /> existing bicycles and pedestrian facilities. <br /> Site(s) affected: All (Phase I and Full Buildout). <br /> (Draft SEIR, pp. 4.D-57 to 4.D-60.) <br /> Impact 4.D-11 <br /> Operation of uses within the Project would be inconsistent with adopted polices, plans, <br /> and programs supporting alternative transportation. <br /> The Revised Final SEIR evaluates the impact of the Project related to alternative <br /> transportation. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the Project that would avoid the <br /> significant environmental effect as identified in the Revised Final SEIR. <br /> Implementation of Mitigation Measures 4.D-3 and 4.D-4 would reduce this <br /> impact to a less than significant level and are incorporated into the Project. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact would be reduced to less than significant. <br /> 1. Implementation of the Project could affect bicycle and pedestrian traffic as <br /> well as transit service along Johnson Drive, especially in relation to <br /> movements into and out of new uses developed along Johnson Drive. <br /> 2. Mitigation Measures 4.D-3 and 4.D-4 set forth in Table 5-1 of the Final <br /> SEIR, listed in the RMMRP, and included in the Findings for Impact 4.D- <br /> 9 above will ensure that Impact 4.D-11 would be reduced to a less than <br /> significant level, and are hereby incorporated by reference. <br /> (Draft SEIR, pp. 4.D-65 to 4.D-66.) <br /> Impact 4.D-12 <br /> Development facilitated by the Project would result in increased demand for motor <br /> vehicle parking,or remove existing parking areas. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.