My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:28:08 PM
Creation date
1/28/2020 4:28:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
Document Relationships
11 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENT 5A
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENTS 6-9
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
finds that the Revised Final SEIR is adequate to support the approval and adoption of all Project <br /> components. <br /> Finally,the City Council finds that the references to specific analysis and documentation <br /> cited in these Findings is not exhaustive; the City Council considered the complete record of <br /> proceedings described below in making these Findings. <br /> b. Record of Proceedings <br /> For purposes of CEQA and these Findings, the record of proceedings for the City <br /> Council's decision to certify the Revised Final SEIR and approve the Project consist of matters <br /> of common knowledge to the City Council, including but not limited to federal, state, and local <br /> laws and regulations, and the following documents that are in the custody of the City and <br /> complied in accordance with Public Resources Code section 21167.6(e): <br /> • The General Plan EIR; <br /> • The 2012 SEIR; <br /> • All notices issued by the City, including but not limited to notices of preparation, <br /> availability, and completion, that were issued by the City in conjunction with the <br /> Project; <br /> • The Revised Final SEIR, which includes the following: <br /> o The Draft SEIR; <br /> o The Final SEIR as previously certified (including all written comments <br /> and responses to comments received during the Draft SEIR comment <br /> period,revisions to the Draft SEIR, and the Johnson Drive Economic <br /> Development Zone Supplemental Comparative Analysis dated August <br /> 2016); <br /> o The Partial Recirculated Draft SEIR; <br /> o All written comments and responses to comments received during the <br /> Partial Recirculated Draft SEIR comment period and revisions to the <br /> Partial Recirculated Draft SEIR contained in Chapter 4 of the Revised <br /> Final SEIR("Summary of Changes to the Partial Recirculated Draft <br /> SEIR"). <br /> o The Revised Mitigation Monitoring and Reporting Program ("RMMRP") <br /> for the Project; <br /> • The Review of Final Supplemental Environmental Impact Report for the Johnson <br /> Drive Economic Development Zone memorandum dated June 5, 2017, prepared <br /> by ESA; <br /> • All decisions, findings and resolutions submitted and/or adopted by the City in <br /> connection with the proposed Project, and all documents cited or referred to <br /> therein; <br /> • All final reports, studies, memoranda, maps, correspondence, and related <br /> documents prepared by the City, or the consultants or responsible or trustee <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.