Laserfiche WebLink
on building square footage that would be allowed under JDEDZ zoning). This methodology <br /> results in a $28.28 per building square foot fee for retail uses and a $13.70 per building square <br /> foot fee for hotels. Figure 4 shows how that methodology would result in potential fees by <br /> parcel within the project area. <br /> Figure 4: Table of Potential JDEDZ Fees by Parcel <br /> JDEDZ Transportation Fee by Parcel <br /> Projected Phase I Development(excluding Costco) <br /> Transpo <br /> rtation <br /> Building Fee per <br /> Parcel Use Size [1] Parcel Size [3] GSF Total Fee <br /> 'arcel9/10 Retail 5,000 NA $28.28 $141,397 <br /> Parcel 9 Hotel 66,000 105,851 13.70 904,200 <br /> Parcel 10 Hotel 66,000 123,710 13.70 904,200 <br /> Totals 137,000 229,561 NA $1,949,797 <br /> Projected Phase II Development <br /> Transpo <br /> rtation <br /> Building Fee per <br /> Parcel Use Size [2] Parcel Size [3] GSF Total Fee <br /> Parcel 1 Retail 19,210 64,033 $28.28 $543,246 <br /> Parcel2 Retail 12,153 40,511 28.28 343,689 <br /> Parcel 3 Retail 12,023 40,075 28.28 339,990 <br /> Parcel 4 Retail 12,284 40,946 28.28 347,379 <br /> Parcel 5 Retail 12,284 40,946 28.28 347,379 <br /> Parcel 6b Retail 12,153 40,511 28.28 343,689 <br /> Parcel 7 Retail 25,483 84,942 28.28 720,635 <br /> Parcel 8 Retail 47,045 156,816 28.28 1,330,402 <br /> Parcel 11 Retail 76,840 256,133 28.28 2,172,992 <br /> Totals 229,474 764,913 NA $6,489,403 <br /> Total All Phases 366,474 994,474 NA $8,439,200 <br /> FISCAL IMPACT <br /> ALH Economics, an urban and regional economic consulting firm under contract to the City, <br /> prepared a fiscal impact analysis (Exhibit D.1.) of the JDEDZ based upon the methodology and <br /> assumptions included in a fiscal impact study prepared for the JDEDZ in February 2015. <br /> The February 2015 study was updated to take into account the City's Fiscal Year 2015/16 <br /> budget, as well as operating characteristics specific to the JDEDZ, such as likely taxable sales <br /> and sales that could be diverted from existing businesses in the market area. <br /> The fiscal impact analysis results indicate on a worst-case basis, assuming all diverted sales <br /> (i.e., sales accruing to the club retail use as opposed to existing retailers in the area) are <br /> diverted from Pleasanton retailers (as opposed to retailers outside of Pleasanton), the JDEDZ <br /> is anticipated to generate a projected $1.4 to $1.7 million annual contribution to the City's <br /> General Fund at the completion of the first phase (which includes the club retail and hotel <br /> uses). This net revenue estimate increases to $2.1 to $2.3 million annually upon full buildout of <br /> the JDEDZ. At full buildout these net fiscal revenues represent an annual contribution <br /> equivalent to approximately 2.1 percent to 2.3 percent of the City's General Fund <br /> P14-0852 and PUD-105, JDEDZ Planning Commission <br /> 14 of 15 <br /> Planning Commission <br /> 13 of 15 <br />mprovements require approval by Caltrans and thus are outside the immediate control of the <br /> City. The graphics below (Figures 2 and 3) are intended to provide an overview of the required <br /> transportation mitigation improvements resulting from the implementation of the JDEDZ. For <br /> more detailed information, please refer to Chapter 4.D of the DSEIR (Exhibit D). <br /> The DSEIR concluded that other impacts from the JDEDZ on aesthetics, air quality, biological <br /> resources, cultural resources, geology and soils, greenhouse gas emissions, hazards and <br /> P14-0852 and PUD-105, JDEDZ Planning Commission <br /> 10 of 15 <br />process after receipt of a complete application. <br /> P14-0852 and PUD-105, JDEDZ Planning Commission <br /> 8 of 15 <br /> ,,,..., w <br /> '-` V, , <br /> ' :# \ I. # ..„ , <br /> 3409 3436 , 3439 c,,,,,,, p 3 u, <br /> , 17,, 406. '-• o- • 343 n5 ''' <br /> 3640 3636 -..,,,90 <br /> '' \ 4,\,i, ' 4 <br /> 0 <br /> -A <br /> A '--, ' / ' `') } '\'if , w\tis,"/ V , <br /> itiib/ ifo,, /1*-4•1 4 <br /> A 3656 .1 ,,.;,' , 1 J - I <br /> -- <br /> - <br /> rI <br /> ./7 '-' 17 Fairlands o <br /> ".) .L. , IF0j23 / <br /> V <br /> mfl'f 'S <br /> . l' 0' (-1/ <br /> 4VA'" c:T <br /> i <br /> , V 7 <br /> .... '',.., <br /> 7 <br /> _ ..... „. <br /> f I <br /> M :I <br /> 3289 <br /> 7, 60; <br /> .s114 301 <br /> ,37 <br /> ... eich 31 AR 3195 al ' <br /> 1:3,800 <br /> 0 0.0475 0.095 mi P19-0283, 6700 Santa Rita Rd, Panache Academie Planning Division <br /> November 18,2019 r, <br /> 0 237.5 475 Feet <br />