Laserfiche WebLink
• The Energy Resources Analysis found that the JDEDZ would not have significant <br /> energy-related impacts. <br /> In summary, the RDSEIR did not change any conclusions in the DSEIR or FSEIR except <br /> impacts related to construction-related criteria pollutants and significant and unavoidable <br /> impacts due to JDEDZ operations. The only significant and unavoidable impacts for the <br /> JDEDZ project that remain are the transportation and traffic impacts identified in the DSEIR <br /> and summarized in the section above. A Revised Mitigation Monitoring and Reporting Program <br /> (RMMRP) has been prepared and is included with the RFSEIR. <br /> Public Comments on RDSEIR <br /> The City received nearly 300 comment letters during the RDSEIR comment period, the <br /> majority of which expressed support for (about 85 percent) or opposition to (about 14 percent) <br /> the JDEDZ. No public agencies submitted comments. <br /> CEQA Guidelines section 15088 requires the City to respond to comments that address <br /> environmental issues or the substance of the RDSEIR. And CEQA Guidelines section <br /> 15088.5(0(2) only requires the City to respond to comments concerning the recirculated <br /> portions of the Draft SEIR. Nonetheless, the City provided responses to other comments <br /> received during the comment period for informational purposes. <br /> While the responses to comments on the RDSEIR resulted in some changes to the modeling <br /> and figures used in the Updated Air Quality Analysis and the Health Risk Assessment, the only <br /> change to a RDSEIR conclusion is noted in Chapter 3 (Responses to Comments), which notes <br /> that new Mitigation Measure M-AQ-2 relating to requiring low-VOC architectural coatings is <br /> actually not required to reduce the potential operational air quality impact to a less than <br /> significant level. <br /> Revised Final Supplemental Environmental Impact Report (RFSEIR) <br /> The complete RFSEIR includes: <br /> • The DSEIR; <br /> • The FSEIR as previously certified (including all written responses to comments received <br /> during the DSEIR comment period, revisions to the DSEIR, and the Economic Impact <br /> Analysis); <br /> • The RDSEIR; <br /> • All written responses to comments received during the RDSEIR comment period; and <br /> • A Revised Mitigation Monitoring and Reporting Program (RMMRP). <br /> JDEDZ TRANSPORTATION FEE <br /> To recoup infrastructure costs borne by the City, staff has been directed by Council to provide <br /> a methodology and structure for a possible JDEDZ Transportation Fee. The new fee would be <br /> assessed on new development within the project area at the construction permitting stage. The <br /> City will use the proceeds from the new fee to reduce the amount owed to Costco through the <br /> proposed sales tax sharing agreement which, in turn, will reduce the years in which the City <br /> would be required to share the sales tax generated from the Costco store with Costco. A <br /> general description of that fee methodology and structure is provided below. <br /> Staff has developed a proposal to allocate the $8.4 million of costs not contributed by Costco <br /> to the future developments based on the percent of total trips at build-out by land use (based <br /> P14-0852 and PUD-105. JDEDZ Planning Commission <br /> 13 of 15 <br />mprovements require approval by Caltrans and thus are outside the immediate control of the <br /> City. The graphics below (Figures 2 and 3) are intended to provide an overview of the required <br /> transportation mitigation improvements resulting from the implementation of the JDEDZ. For <br /> more detailed information, please refer to Chapter 4.D of the DSEIR (Exhibit D). <br /> The DSEIR concluded that other impacts from the JDEDZ on aesthetics, air quality, biological <br /> resources, cultural resources, geology and soils, greenhouse gas emissions, hazards and <br /> P14-0852 and PUD-105, JDEDZ Planning Commission <br /> 10 of 15 <br />process after receipt of a complete application. <br /> P14-0852 and PUD-105, JDEDZ Planning Commission <br /> 8 of 15 <br /> ,,,..., w <br /> '-` V, , <br /> ' :# \ I. # ..„ , <br /> 3409 3436 , 3439 c,,,,,,, p 3 u, <br /> , 17,, 406. '-• o- • 343 n5 ''' <br /> 3640 3636 -..,,,90 <br /> '' \ 4,\,i, ' 4 <br /> 0 <br /> -A <br /> A '--, ' / ' `') } '\'if , w\tis,"/ V , <br /> itiib/ ifo,, /1*-4•1 4 <br /> A 3656 .1 ,,.;,' , 1 J - I <br /> -- <br /> - <br /> rI <br /> ./7 '-' 17 Fairlands o <br /> ".) .L. , IF0j23 / <br /> V <br /> mfl'f 'S <br /> . l' 0' (-1/ <br /> 4VA'" c:T <br /> i <br /> , V 7 <br /> .... '',.., <br /> 7 <br /> _ ..... „. <br /> f I <br /> M :I <br /> 3289 <br /> 7, 60; <br /> .s114 301 <br /> ,37 <br /> ... eich 31 AR 3195 al ' <br /> 1:3,800 <br /> 0 0.0475 0.095 mi P19-0283, 6700 Santa Rita Rd, Panache Academie Planning Division <br /> November 18,2019 r, <br /> 0 237.5 475 Feet <br />