Laserfiche WebLink
Pleasanton Cateway Environmental Checklist <br />c) The proposed project is an intill site within an existing business park surrounding area by com- <br />mercial, industrial, and institutional properties. Therefore, this would be a no-impact. <br />3. AIR QUALITY <br />Environmental Setting <br />The Bay Area has remained one of the cleanest of the five major urban California air basins in recent <br />years, however, there are still several days annually when air pollution exceeds the federal and state air <br />quality standards. These standards, set at different concentrations for each of the major air pollutants <br />have been developed to protect public health. <br />The Bay Area Air Quality Management District (BAAQMD) regulates air quality in the Bay Area Re- <br />gion through its permit authority over most stationary emission sources and through its planning and re- <br />view activities. The BAAQMD is the main permitting agency for air pollutant sources. <br />Standards of Significance <br />For purposes of this environmental document, an impact is considered significant if the proposed project <br />would: <br />• Result in pollution emission levels above those established by BAAQMD in either short term <br />(construction related) or long term(traftic). <br /> Less 'T'han <br />Potentially Significatr[ Less'rhan <br />Signitictmt With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Air Quality <br />Where available, the significance criteria established by the applicable air quality management or air <br />pollution control district may be relied upon to make the,following determinations. Would the project: <br />a) Conflict with or obstruct implementation of the appli- ^ ^ X^ ^ <br />cable air quality plan`? <br />b) Violate any air quality standard or contribute substan- ^ ^ ~ ^ <br />tially to an existing or projected air quality violation? <br />b) Result in a cumulatively considerable net increase of ^ ^ ~ ^ <br />any criteria pollutant for which the project region is <br />non-attainment under an applicable federal or state <br />ambient air quality standard (including releasing emis- <br />sions, which exceed quantitative thresholds for ozone <br />precursors)? <br />d) Expose sensitive receptors to substantial pollutant con- ^ ^ X^ ^ <br />centrations? <br />Pleasanton Gateway Initial Study Page I S of 37 Novetnber 8, 2006 <br />