My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Gateway Environmental Checklis! <br /> Less "Chan <br /> Potentially Significant Less Than <br /> Significant With Mitigation Significant No <br />Issues (Continued) Impact Incorporated Impact Impact <br />e) Create objectionable odors affecting a substantial num- <br />ber of people? <br />Discussion <br />a-d) The proposed project is expected to generate short-term impacts related to construction activities. <br />Initially, short-term impacts will be due to mobilization, clearing and grubbing, site grading, and <br />trenching for on-site infrastructure leading to the construction of the building and site improve- <br />ments. During construction some equipment may exceed some of the established BAAQMD <br />emissions standards, however, it is required that all construction equipment meet all current ex- <br />haust standards for emission reductions to maintain compliance to the NOG. To mitigate short <br />term construction impacts the project will be required to provide dust control measures to reduce <br />dust emissions and PMfo: <br />• Enclose, cover or water all soil piles minimally twice daily, or as otherwise determined <br />by the City Engineer. <br />• Water all haul roads twice daily. <br />Long-term operational emissions would be generated by both stationary and mobile sources as a <br />result of normal day-to-day activities on site subsequent to construction completion. Stationary <br />area source emission would be generated by the vehicles queued in the two drive-through aisles <br />and operation of landscape maintenance equipment. However, Mobile source emissions would <br />be generated by motor vehicles traveling to and from the project site. Therefore, this would be a <br />less-than-sign (cant-impact. <br />c) The proposed project will result in the construction of a commercial development and is not ex- <br />pected to produce post construction objectionable odors. Odor control devices will be required <br />on all restaurants as a means of controlling cooking odors. Therefore, this would be a less-than- <br />significant-impact. <br />4. BIOLOGICAL RESOURCES <br />Environmental Setting <br />Wetlands are regulated under federal, state and local laws, regulations and policies. Primary wetland <br />regulatory compliance is under the federal Clean Water Act, the California Department of Fish and <br />Game (CDFG), United States Fish and Wildlife Service (USFWS) and California Environmental Qual- <br />ity Act (CEQA). <br />The Clean Water Act requires avoidance of wetlands whenever a practicable alternative exists. For un- <br />avoidable impacts, the regulatory agencies have policies calling for mitigation to provide "no net loss" <br />of acreage or habitat value. Under Section 404 of the Clean Water Act, a permit must be obtained for <br />the discharge of dredged or fill material into waters of the United States. <br />Pleasanton Gatewcry Initial Study Page 16 of 37 November 8, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.