Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-21 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />April–August; 3) queens solo flight is <br />September–October when queens find a <br />hibernation area. Surveys will be conducted <br />in the two flight periods prior to the start of <br />construction with two surveys occurring at <br />least 3 weeks apart within each of those <br />flight periods. These surveys will increase <br />the likelihood this species and their <br />underground nests are observed will they be <br />present on the project site. Survey schedules <br />are shown below: <br />Construction <br />Date Start <br />Required <br />Survey <br />Periods <br />Dates of Survey <br />Periods <br />• Nov–Mar • 2 and 3 • Two surveys April– <br />August <br />• Two surveys <br />September–Octobe <br />• Apr–Aug • 3 and 1 • Two surveys <br />September–Octobe <br />• Two surveys <br />February–March <br />• Sept–Oct • 1 and 2 • Two surveys <br />February–March <br />• Two surveys April– <br />August <br /> <br />Bumble bees observed shall be <br />photographed and a Global Positioning <br />System (GPS) point taken. If a Crotch’s <br />bumble bee is positively identified, general