My WebLink
|
Help
|
About
|
Sign Out
WOODARD & CURRAN, INC. (SECOND AMENDMENT)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOODARD & CURRAN, INC. (SECOND AMENDMENT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 12:12:27 PM
Creation date
2/19/2025 12:05:37 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
WOODARD AND CURRAN SECOND AMENDMENT
Contract Record Series
704-05
Munis Contract #
2024335
Contract Expiration
6/30/2026
Document Relationships
WOODARD & CURRAN, INC. (FIRST AMENDMENT)
(Attachment)
Path:
\CITY CLERK\CONTRACTS\W
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton T4 Booster Pump Station and F1 Pipeline <br />Amendment No. 2 <br />November 26, 2024 Page 3 of 3 <br />Task 4.4 Labor Estimate <br />Compensation <br />The total additional compensation budget for Engineering Services authorized under this Amendment No. 2 is <br />$60,000 with contingency, as summarized below and in the attached fee spreadsheet. This amendment brings the <br />total contract dollar amount to $836,365 from $776,365. <br />Task Description Amendment No. 2 <br />Authorization <br />4.4 Engineering Services During Construction <br />(Amendment No. 2) $47,950 <br />4.4.1 Additional As needed Support Contingency $12,050 <br />Total $60,000 <br />Schedule and Contract Completion. <br />This amendment extends the contract completion date to June 30, 2026. <br />Docusign Envelope ID: F88C88B6-DA91-4686-8531-4DB35D913BE5Docusign Envelope ID: 5444301A-4BDB-40FA-B341-5FEECD8986CE
The URL can be used to link to this page
Your browser does not support the video tag.