My WebLink
|
Help
|
About
|
Sign Out
WOODARD & CURRAN, INC. (SECOND AMENDMENT)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOODARD & CURRAN, INC. (SECOND AMENDMENT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 12:12:27 PM
Creation date
2/19/2025 12:05:37 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
WOODARD AND CURRAN SECOND AMENDMENT
Contract Record Series
704-05
Munis Contract #
2024335
Contract Expiration
6/30/2026
Document Relationships
WOODARD & CURRAN, INC. (FIRST AMENDMENT)
(Attachment)
Path:
\CITY CLERK\CONTRACTS\W
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 2 <br />Mike M. Mirko M Kyle C Tom S Donna R Robert S Engineer 3 Steve J. Chris H. Total Hours W&C Labor Sub Fee 2 Total <br />Amendment 2 Rates $335 $295 $285 $280 $280 $275 $250 $200 $120 <br />4.1.1 <br />Additional Support for RFI and Submittal Reviews for Near-Term Contract <br />(F1 Pipeline and Pump Station Site)8 4 8 4 16 12 1 53 13,360$ 13,360$ <br />4.3.1 Supplemental Construction Survey Staking (two days)-$ 7,345$ 7,345$ <br />4.4 Review of Supplier Pump Station Package Final Design 12 16 10 16 19 16 12 2 103 27,245$ 27,245$ <br />4.4.1 Contingency (additional as needed support)2 12 12 8 8 2 44 12,050$ 12,050$ <br />Total Amendment No. 2 20 20 10 24 23 32 24 3 156 52,655$ 7,345$ 60,000$ <br />27,600$ 88,310$ 124,290$ 31,360$ 61,880$ 36,285$ 183,125$ 81,000$ 13,100$ 836,365$ <br />Notes 1) See Attached Worksheet for Labor Hours / Costs Breakdown. <br />2) Subconsultant markup is 10-percent for this project. <br />3) Direct cost is for printing, reproduction, and travel. <br />Task Mike M. Mirko M Kyle C Tom S Donna R Robert S Engineer 3 Steve J. Chris H. Total Hours <br />Review of final layout (pumps, building, electrical and scada equipment)1 4 6 11 <br />Review of Pre-fabricated enclosure (anchorage requirements-review of calculations) 1 4 5 <br />Review of final mechanical, piping, valves and connection to pipeline 2 4 1 1 6 14 <br />Electrical requirements and equipment panels 1 4 4 4 13 <br />Instrumentation and SCADA equipment (review of logic and control diagrams, <br />panels) 1 1 2 4 8 <br /> Review of Intrusion alarms and security requirements.1 1 2 4 <br />Review of final lift station O&M manual (Provide by others)1 4 1 4 6 16 <br />Respond to questions (up to 8 RFI email responses) for the City and Supplier 4 4 4 6 6 6 2 32 <br />Total 12 16 10 16 19 16 12 2 103 <br />Amendment Number 2 Labor Estimate for Task 4.4 <br /> Overall Project Total Cost (Includes Amendment 1&2) <br />Pleasanton - Fee Table - Amendment No. 2-1.15.2024.xlsx <br />Docusign Envelope ID: F88C88B6-DA91-4686-8531-4DB35D913BE5Docusign Envelope ID: 5444301A-4BDB-40FA-B341-5FEECD8986CE
The URL can be used to link to this page
Your browser does not support the video tag.