My WebLink
|
Help
|
About
|
Sign Out
DHR CONSTRUCTION
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
D
>
DHR CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:03:23 PM
Creation date
1/22/2025 12:53:55 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Landscape Maintenance
Contract Type
New
NAME
DHR CONSTRUCTION
Contract Record Series
704-05
Munis Contract #
2025303
Contract Expiration
1/31/2025
NOTES
CONSTRUCTION AGREEMENT CALLIPPE PRESERVE GOLF COURSE BUNKER RENOVTION RFP PWD #24-303
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />properly to allow the bunker cavity to drain. <br /> <br />The locations of trenches will be as determined and subsequently painted out in the cavity by OWNER or AGENT. <br />It is anticipated that the existing drainage layout can be used. Each sand bunker is to be drained with drainage <br />trenches in a herringbone pattern with no distance between trenches or un-drained area in excess of twenty (20) <br />feet, unless approved by OWNER or AGENT. The top of the pipe shall be set no higher than two (2) inches below <br />the top surface of the trench and centered within the eight (8) inch width of the trench. Each drainage trench shall <br />slope a minimum of one-half percent (.5%) and shall terminate to the low point (or points) of the sand bunker where <br />drainage will be collected and exit via the outfall pipe. Drainage from the bunker floor shall continue downgrade <br />at a greater depth, if necessary, to the edge of the sand bunker where OWNER or AGENT has designated the <br />drainage exiting the sand bunker. <br /> <br />The minimum rate of fall shall not be less than one-half percent (.5%) at any point within the drainage trenches. At <br />the edge of the sand bunker where drainage exits, the perforated pipe shall connect to the existing outfall pipe. All <br />areas of the sand bunkers are to be built with adequate drainage. No water will be permitted to stand in any portion <br />of any bunker. This is to be accomplished by sub-grades draining to the herring-bone drainage system and exiting <br />the bunker via the “outfall” connection point. <br /> <br />Prior to placement of the gravel blanket Contractor will provide OWNER or AGENT with a record drawing (As- <br />built) of the installed drainage showing the percentages of fall. In addition to the record drawing Contractor will <br />provide to OWNER or AGENT digital photos, on USB flash drive or via email, showing the complete drainage <br />system. CONTRACTOR WILL NOT BE GRANTED APPROVAL TO INSTALL THE GRAVEL LAYER <br />UNTIL AS-BUILT DOCUMENTS HAVE BEEN REVIEWED AND APPROVED BY OWNER OR <br />AGENT. The OWNER of AGENT may waive the As-built submittal requirement if no major changes to the <br />drainage system layout are required. OWNER or AGENT will visually inspect all drainage installation, with written <br />sign-off required before Contractor is authorized to install the pea gravel layer in bunker cavity. <br /> <br />Installation of new drainage lines may not require flush-out lines. However, if needed and determined by OWNER <br />or AGENT, a flush-out line may be required for some sand bunkers. In general, flush-out lines shall extend from <br />the top side of the main drainage line of the sand bunker and terminate to the point where it will connect to a riser <br />and trimmed and finished as specified by OWNER or AGENT. Single flush outs will be contained in a six (6) inch <br />diameter irrigation valve box. In instances where two flush outs are next to each other, the risers will be contained <br />in a single ten (10) inch irrigation diameter valve box. <br /> <br />8. BUNKER LINER INSTALLATION <br />Contractor will not be allowed to deviate from the Better Billy Bunker or other manufacturers specifications and <br />must not cause any portion of the Better Billy Bunker or other approved manufacturer’s warranty to be voided or <br />disallowed due to construction means and methods utilized by the Contractor. <br /> <br />8.1. Bunker Cavity Preparation <br />The Better Billy Bunker System or other approved system must be installed in an approved bunker cavity. The <br />area to be covered with the specified liner shall be water settled and mechanically compacted with a hand <br />operated compacting machine to a minimum dry density of ninety-five percent (95%). Absolutely no loose soil <br />shall remain in the bunker cavity prior to liner placement. No liner material will be placed in bunker until <br />OWNER or AGENT has approved the bunker shape, depth, and compaction of the bunker cavity. <br /> <br />8.2. Gravel Layer Blanket <br />A layer of approved gravel shall be placed over the entire floor of the bunker at a depth of two (2) inches <br />(51mm) deep. This gravel shall be brought up the edge of the bunker leaving room for four (4) inches of bunker <br />sand on all slopes and edges. Should machines be used to spread the gravel in the bunker cavity, care must be <br />taken to prevent any damage to the sub-base and/or drain lines. Contractor must protect the vertical bunker <br />edges at all times when dumping gravel along the bunker edges. The gravel selected will be sent by the <br />Contractor to Turf & Soil Diagnostics, (613 1st Street, Linwood Kansas 6602 (913)723-3700) soils lab or other <br />Docusign Envelope ID: 06528EA8-C8FB-4176-8C2E-D53F24B897F0
The URL can be used to link to this page
Your browser does not support the video tag.