Laserfiche WebLink
2 <br /> <br />workmanship, quality, flow grades, and satisfactory demonstration of flow into all inlets and through all pipes with <br />no damage at exit point before approval by the OWNER or AGENT. All materials shall be subject to rejection for <br />failure to conform to any specification requirements. OWNER or AGENT shall plainly mark rejected material and <br />the Contractor shall replace rejected material with material that meets the requirements of these specifications and <br />remove rejected material immediately from the work site. <br /> <br />2. SCOPE OF WORK <br />Work to be performed by Contractor at CALLIPPE PRESERVE GOLF COURSE will be the renovation of all <br />named bunker cavities including, but not limited to the following: <br /> <br />Bunker Renovation/Sand Replacement <br />The work consists of furnishing all equipment and materials and performing all work in connection with the <br />removal of existing sand, replacement of the existing sub-surface drainage pipe, reconstitution of bunker cavity to <br />ensure no slopes are greater than the angle of repose of said bunker sand, installation of new drainage pipe and <br />fittings, installation of approved pea gravel, installation of Better Billy Bunker lining material, installation of <br />approved bunker sand to a compacted depth and finished grading, installation of subsurface irrigation around the <br />perimeter of the bunker, and sodding of all disturbed areas outside of bunker cavity. <br /> <br />3. AREA OF DISTURBANCE <br />All excavation areas shall be marked out in advance of excavation by OWNER or AGENT. All sod within the <br />delineated area will be removed and disposed of offsite. <br /> <br />4. EXCAVATION OF EXISTING SAND <br />All sand and drainage materials shall be excavated from the bunker cavity. Any resulting excavated native soil will <br />be stocked piled and used in the reconstitution of the bunker edges and slopes to a maximum of 25 degrees. <br />Contractor will perform removal of the sand and drainage materials in a manner to minimize equipment damage to <br />the bunker complex and surrounding area. Any damage resulting from the removal of the sand and drainage <br />materials will be repaired by Contractor to the approval of OWNER or AGENT. Excavated bunker sand will be <br />distributed in areas designated by the Golf Course Superintendent and placed to a depth per their instruction over <br />the designated area(s). <br /> <br />5. DEWATERING <br />The Contractor shall remove all water from any source that accumulates during the excavation process and prior to <br />the installation of specified drainage pipe. The embedment or pipe shall not be installed in water. <br /> <br />6. BUNKER CAVITY PREPARATION <br />Remove all sand, gravel and loose material to a compacted base. Sand bunker edges will be marked for trimming <br />by OWNER or AGENT. The cavity edges shall be excavated vertically to a depth of six (6) inches. All bunker <br />slopes will not exceed the angle of repose of chosen bunker sand and will be checked by a digital level to the <br />satisfaction of OWNER or AGENT and Contractor will not be allowed to reconstruct any slopes in excess of the <br />angle of repose of the bunker sand. Where soil material prevents proper foundation preparation at the proposed <br />elevation, the Contractor shall deepen excavation to a level where a proper foundation can be prepared. Any <br />materials removed shall be replaced with acceptable fill until stable at proposed grade. Sand limits will be painted <br />in the field by OWNER or AGENT. In general it is OWNER or AGENT’S intent to maintain the existing sand <br />lines, however in a few cases the sand lines will be modified by OWNER or AGENT to aid in the establishment of <br />an acceptable slope. <br /> <br />7. DRAINAGE INSTALLATION <br />The entire foundation area in the bottom of all trench excavation and bunker cavity shall be smooth, firm, stable, <br />and at uniform density and completed immediately prior to the placing of pipe or materials. Drainage of sand <br />bunkers shall be accommodated by a drainage trench or multiple trenches connecting to each other, each trench <br />measuring eight (8) inches wide and twelve (12) inches deep connecting into an acceptable and functional outfall <br />pipe. Contractor is responsible for ensuring outfall pipe exiting the bunker cavity is not restricted and functioning <br />Docusign Envelope ID: 06528EA8-C8FB-4176-8C2E-D53F24B897F0