Laserfiche WebLink
-PG&E Contact: Jessica Jone,, email: K Jrl 7<a p"e.n>m . The application for <br />PG&E utility box adjustment has beenfiled under application No. 000226701 . <br />H) On drawing A 1.1 there are two references to existing PG&E vaults to be adjusted , <br />one noted (BY OTHERS, TYP) and the other does not. What is the difference in <br />these with regards to who is responsible for their adjustment. <br />-All PG&E va ults are to be adjusted by PG&E. The "By Others, Typ . <br />(typical)" is sometimes only shown once to keep the plans legible as much as <br />possible. Where the typical is being mentioned, this should apply to all project <br />plans. <br />I) Please confirm when the plans call out for R/R of C/G, that these items will be <br />paid for as part of Bid Item # 10. There are locations where curb and gutter <br />replacement call outs extend thru an existing curb ramp or driveway, with the <br />drawing only show that a portion of the valley gutter(@ driveways) getting <br />replaced. Please review sheet A 1-2 that the indicate concrete removal is only <br />within the Right of Way limits. No removal of the complete valley gutter or apron <br />section at the curb return. See attached drawing markup and existing site <br />conditions. Please confirm limits of removal for this item that is measure per <br />linear foot. <br />Yes , call out/or curb/gutter removal and replacement will be paid out per bid <br />Item No. 10 per linear foot (LF), except at locations where the work is <br />included in the lump sum (LS) bid item where the called-out quantities are <br />provided for information purposes. <br />-At this location , the RIR 40 LF of curb and gutter includes 10 LF of <br />curb/gutter and 30 LF of valley gutter. The 30 LF of valley gutter will be <br />measured and paid for under curb and gutter pay item . The contractor will <br />saw cut the valley gutter at the apron section and tie into the limits of curb <br />removal. The actual limit of the replacement will be marked, measured and <br />paid for accordingly. <br />J) Please confirm that the contractor will be allowed to take a traffic lane (with <br />approved TC Plans closures for the replacement of the flatwork scope) <br />-Lane closure to be in accordance with the approved TCP and per Section 2, <br />Traffic Control. <br />K) Please confirm if the scope of work on Sheet Al-5@ Sta. 76+80 (LT) That notes <br />R&R 15 LF of CG w/DI. Is the Intent to Remove & Replace the Drainage Inlet or <br />just the concrete apron around the inlet? These is no bid item for a removal and <br />replacement of a DI in the Bid Proposal. Please clarify . <br />Reference to 12 th paragraph of Section l 5-03M, Special <br />Instruction /Considerations and Section 15-04, Measurement <br />nm.ml Curb and Gutter For Street Resurfacing Project <br />lP . 24 09_ Page 3 <br />DocuSign Envelope ID: DA631F0B-3C25-4585-9688-3F2684907C15