L ) Please confirm if the contractor can use traffic strip ing paint at the res tored the <br />section of pavement replaced at locations for the ADA Ramp s? My understanding <br />that this roadway will be repaved under a separate contract and will get new <br />striping. <br />Yes, tempora ry traffic striping paint can be us ed to restore the existing <br />s trip ing at locatio ns where ADA ramps are being replaced/installed. <br />M) The scope of work on Sheet A 1-2 for the median island nosing modification at <br />Sta. 17 + 19 (RT) does not have a bid item. Please provide how this scope will be <br />measured and paid for . <br />-See detail A on drawing Al-2, the work in volves RIR 12 LF of curb/gutter and <br />12 SF of concrete. The work will be paid for using the C/G unit cost per linear <br />feet and concrete sidewalk unit cost per square foot. <br />N) Will the contract be required to demolish and remove the PCC Band and slab <br />under the (E) Pavers to be salvaged and reinstalled? Can we just remove the <br />pavers and protect the concrete band/slab to pour back the ADA ramp? Your <br />drawings do not show any sawcut line through the paver sections. <br />Conc rete bands are to be protected in placed as called out on the plans. The <br />contractor is not required to demolish and remove the band. <br />Yes , the existing pavers can be removed and put back on ce the new ADA ramp <br />is installed. The limit of paver remo val varies from 1 to 3 feet as stated under <br />the last paragraph of Section 15-03M, page 52, of the Project 's Special <br />Provisions . <br />0) Can you confirm where Bid Item # 14 Install ADA Domes are located. I see one at <br />5050 Hopyard Road per Exhibit A : Temporary Construction Easement <br />Agreement and shown on Sheet Al-1 Sta 6+39 (RT). The item notes 2 EA , where <br />is the second ADA Dome location. <br />-There is only one "install ADA domes,, for the project. (See No. 1 b above.) <br />P) Please confirm that Bid Item Grind Lip and Install ADA Dome is located at 5050 <br />Hopyard Road per Exhibit A and sheet Al-1 at Sta. 6+ 14 (RT). <br />Yes. Confi rmed. <br />Q) Please confirm that the ADA Domes mentioned in Bid items # 13 & # 14 are glue- <br />down type as mentioned under: Scope of work & Proj ect Location in the notice to <br />bidders . <br />Yes , the two locations for ADA dome in s ta llations are g lue-down typ e. <br />Annual Curb and Gutter For Street Resurfacing Proj ect <br />CIP NO . 24509 _ Page 4 <br />DocuSign Envelope ID: DA631F0B-3C25-4585-9688-3F2684907C15