My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:34:11 AM
Creation date
2/10/2022 9:27:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist <br />Tribal Cultural Resources <br />provided by the Dublin -San Ramon Services District (DSRSD) treatment plant located in Pleasanton. <br />The DSRSD treatment plant currently treats approximately 10.3 million gallons per day (mgd) and <br />treats approximately 10.7 mgd during wet weather conditions. The treatment plant has an average <br />dry weather flow treatment capacity of approximately 17.0 mgd.97 <br />The CAP 2.0 would not result in new land uses that would generate sanitary wastewater or <br />otherwise contribute to an increase in wastewater treatment requirements. Rather, CAP 2.0 <br />Strategy WR -1 would expand incentives for water fixture retrofits, such as low -flow faucets and <br />toilets, that could help reduce the production and treatment of wastewater within the City. <br />Furthermore, the CAP 2.0 would not require relocation or construction of new wastewater <br />treatment infrastructure. Therefore, no impact related to need for construction or expansion of <br />wastewater treatment facilities and infrastructure would occur. <br />Stormwater Drainage Facilities/Infrastructure <br />The City of Pleasanton maintains a system of storm drains, gutters, ditches, and arroyos to convey <br />stormwater generated during rain events. As discussed in Section 10, Hydrology and Water Quality, <br />implementation of CAP 2.0 Actions related to building electrification and energy and water <br />efficiency upgrades, renewable energy production and storage, transportation, green stormwater <br />infrastructure, and urban trees may promote infrastructure development that would involve small- <br />scale construction. Construction of projects implemented in accordance with the CAP 2.0 could <br />result in erosion and potential changes to drainage patterns. However, as described in Section 7, <br />Geology and Soils, and Section 10, Hydrology and Water Quality, CAP 2.0 projects would be required <br />to comply with local, State, and federal requirements during construction that would control <br />stormwater runoff, erosion, and potential impacts to the stormwater drainage system. <br />Furthermore, CAP 2.0 Actions S8 and P13 encourage new green stormwater management <br />infrastructure such as bioswales and green roofs and the planting of additional urban trees within <br />the community, that would help to reduce impermeable groundcover and stormwater flows to the <br />City's drainage facilities. Therefore, no impact related to need for construction or expansion of <br />stormwater drainage facilities and infrastructure would occur. <br />Electric Power Facilities/Infrastructure <br />Electric power service in the City is provided by EBCE using transmission infrastructure operated and <br />maintained by Pacific Gas & Electric (PG&E). CAP 2.0 Strategies BE -1, BE -2, and TLU-3 promote <br />building electrification of new and existing buildings, energy efficiency retrofits of existing buildings, <br />and energy efficient LEED buildings for future development. CAP 2.0 Actions S3 and P4 support <br />installation of small-scale solar PV systems and battery storage facilities at new developments and <br />existing municipal facilities to provide greener renewable electricity within the City. In addition, CAP <br />2.0 Action P5 encourages new EV infrastructure throughout the City. These CAP 2.0 strategies and <br />actions may slightly alter electricity demand within Pleasanton. However, the CAP 2.0 would serve <br />as a pathway to reduce GHG emissions, including emissions related to energy consumption, and <br />other beneficial environmental and sustainability effects. These benefits include a reduction in <br />energy consumption. Therefore, the CAP 2.0 would result in a less -than -significant impact related <br />to construction, expansion, or relocation of electric power facilities and infrastructure. <br />97 Dublin -San Ramon Services District. 2021. District at a Glance Fact Sheet. Available: <br /><https://www.dsrsd.com/home/showpublisheddocument?id=811>. Accessed October 18, 2021. <br />Final Initial Study - Negative Declaration <br />85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.