My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:34:11 AM
Creation date
2/10/2022 9:27:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />Pleasanton Climate Action Plan 2.0 <br />or telecommunications utilities. However, projects resulting from implementation of the CAP 2.0 <br />could include redevelopment and/or restructuring of electricity and natural gas power facilities and <br />infrastructure, as well as new local renewable energy generation and storage and green stormwater <br />infrastructure projects. Potential impacts related to these strategies are discussed further below. <br />Water Supply Facilities/Infrastructure <br />The City of Pleasanton is the retail water supplier for development within the City. Pleasanton <br />obtains its municipal water supply from a mix of local groundwater wells and Zone 7 of the Alameda <br />County Flood Control and Water Conservation District (Zone 7). According to the Pleasanton Urban <br />Water Management Plan (UWMP), the City currently purchases approximately 80 percent of its <br />water from Zone 7 and the remaining 20 percent is produced from the City's groundwater wells. <br />Zone 7 uses a combination of water supplies to meet water demand which include imported surface <br />water from the State Water Project, imported surface water transferred from the Byron Bethany <br />Irrigation District, local surface water runoff captured in Del Valle Reservoir, and local groundwater. <br />The City's distribution system consists of 327 miles of pipelines and 22,369 water service <br />connections. There are 14 pump stations, 22 water storage reservoirs, one hydropneumatics tank, <br />and approximately 51,500 linear feet of recycled water pipeline.94 <br />The City addresses issues of water supply in the Pleasanton UWMP, which is a long-range planning <br />document used to assess current and projected water usage, water supply planning, and <br />conservation and recycling efforts. According to the UWMP, the City has analyzed three different <br />hydrological conditions to determine the reliability of water supplies: average/normal water year, <br />single dry water year, and multiple, dry water year periods. The UWMP indicates that water supplies <br />under the three hydrological conditions will be sufficient to meet demand through 2045. In addition, <br />the UWMP includes a Water Shortage Contingency Plan.95 <br />CAP 2.0 Action P15 seeks to decrease community water use by promoting water efficiency retrofits, <br />sustainable landscaping, and efficient landscaping irrigation. In addition, CAP 2.0 Actions S8 and P13 <br />would increase green stormwater management infrastructure and the planting of urban trees, <br />which would increase permeable surfaces throughout the City, improving water infiltration and <br />groundwater recharge. Furthermore, the CAP 2.0 would not result in new land uses, such as <br />increased residential or commercial development, that would contribute to an increase in water use <br />compared to existing conditions or that would require relocation or construction of new water <br />infrastructure. Therefore, the CAP 2.0 would have no impact related to the need for construction or <br />expansion of water supply facilities and infrastructure. <br />Wastewater Treatment Facilities/Infrastructure <br />The City of Pleasanton collects wastewater within Pleasanton City limits as well as wastewater from <br />the Castlewood Area of Alameda County. The sanitary sewer system currently serves an area of <br />approximately 24 square miles and consists of 250 miles of gravity sewers, approximately 25,192 <br />feet of force main, and ten pump stations.96 Sewage treatment for the collected wastewater is <br />94 Pleasanton, City of. 2021. 2020 Urban Water Management Plan. Available: <br /><https://wuedata.water.ca.gov/public/uwm p_attachments/1451328873/R%20-%20680%20-%2OCity%20of%20PIeasa nton%20- <br />%20Final%202020%20UWMP.pdf>. Accessed October 18, 2021. <br />95 Pleasanton, City of. 2021. 2020 Urban Water Management Plan. Available: <br /><https://w uedata.water. ca.gov/p u bl i c/u wm p_atta ch me nts/1451328873/R%20-%20680%20-%2OCity%20of%20P I ea sa nto n%20- <br />%20Final%202020%20UWMP.pdf>. Accessed October 18, 2021. <br />96 Pleasanton, City of. 2019. Sewer System Management Plan. Available: <br /><http://admin.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BloblD=34321>. Accessed October 18, 2021. <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.