Laserfiche WebLink
Table 1 (continued) <br /> SUMMARY OF POTENTIALLY SIGNIFICANT TRANSPORTATION AND TRAFFIC IMPACTS <br /> Impact Location Affected Mitigation Physical Improvement or Other Mitigation Level of Impact <br /> Measure After Mitigation <br /> Impact 4.D-7: • Northbound 1-680 On-ramp from the eastbound <br /> Development M-TR-1 Implement TDM Program <br /> P Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) Significant and <br /> facilitated by the — Unavoidable due to <br /> proposed EDZ would • Northbound 1-680 On-ramp from the westbound uncertainty about <br /> affect levels of Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) <br /> ultimate Caltrans <br /> service for freeway • Southbound 1-680 On-ramp from the eastbound Freeway congestion relieving improvements including: approval for 1-680, (- <br /> ramps at Stoneridge Drive merge(AM Peak Hour) second phase of 1-680/1-580 interchange improvements, 580 improvements. <br /> merge/diverge areas • Southbound 1-680 On-rampfrom the westbound 4.D-2 wideningof State Route 84,and otherplanned roadway <br /> within 1-680 under Funding:Other <br /> Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) system modifications. <br /> Far-term funding(i.e., not the <br /> (Cumulative)plus • Southbound 1-680 Off-ramp to Stoneridge Drive diverge City's TIF) <br /> Project conditions. (AM Peak Hour) <br /> Impact 4.D-9: Following City review of design plans for club retail and other <br /> Development of the traffic-intensive uses that would be developed as part of <br /> EDZ would increase Phase land buildout of the EDZ,one or more of the following <br /> traffic safety hazards improvements shall be implemented upon City's <br /> for vehicles, determination that Johnson Drive improvements are required: <br /> bicyclists, and 1. If a club retail use is proposed for Parcel 6,signalize one <br /> pedestrians on public or more entrances at Parcel 6,and widen Johnson Drive at <br /> roadways due to Johnson Drive. Implementation of the Project could affect this location,to accommodate a southbound left-turn pocket <br /> roadway design and a northbound right-turn pocket.2.Widen Johnson Drive <br /> vehicular, bicycle, and pedestrian traffic along Johnson Drive, Less than <br /> features, 4.D-3 to provide upto two vehicle travel lanes in each direction <br /> especially in relation to movements into and out of new uses Significant <br /> incompatible uses,or developed along Johnson Drive. from Stoneridge Drive to the main entries of sites with traffic- <br /> project-related intensive uses(such as club retail). 3. Implement other <br /> vehicles trips improvements as needed at major driveways(signal control, <br /> provision of left-turn or right-turn pockets)to provide <br /> additional capacity. 4. Final design of all improvements along <br /> Johnson Drive shall maintain or enhance existing bicycles, <br /> transit,and pedestrian facilities,and shall ensure bicycle and <br /> pedestrian facilities and access to the Alamo Canal Trail at <br /> the signalized crossing at Commerce Circle and any other <br /> signalized locations on Johnson Drive. <br /> 38 <br />