My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:28:08 PM
Creation date
1/28/2020 4:28:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
Document Relationships
11 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENT 5A
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENTS 6-9
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 (continued) <br /> SUMMARY OF POTENTIALLY SIGNIFICANT TRANSPORTATION AND TRAFFIC IMPACTS <br /> Mitigation Level of Impact <br /> Impact Location Affected Measure Physical Improvement or Other Mitigation After Mitigation <br /> to fully mitigate the <br /> impacts. <br /> Funding:City's TIF, <br /> except M-TR-1— <br /> from developer(s) <br /> Johnson Drive and Park and Ride Lot Intersection.The m <br /> Si ficant and <br /> addition of vehicle trips generated by Phase I of the EDZ and M-TR-1 Implement TDM Program 9 <br /> Unavoidable <br /> other near-term projects during the PM peak hour would worsen <br /> the side street movement at this intersection to LOS E; under Funding:City's TIF, <br /> full buildout conditions, this condition would worsen to LOS F. 4.D-1c Same as above for Mitigation Measure 4.D-lc except M-TR-1— <br /> (Impact 4.D-3e) from developer(s) <br /> Improvem <br /> ents <br /> Hopyard Road at Owens Drive Intersection.The addition of identified <br /> vehicle trips generated by Phase I of the EDZ during the PM in Gen. 1. Modify westbound approach:2 left turn, 1 through-right <br /> peak hour would reduce LOS D conditions to LOS E. Full Plan for shared, 1 right turn Less than <br /> buildout of the EDZ would further worsen conditions. (Impact Significant <br /> ( p this 2. Un-split eastbound/westbound signal operation <br /> 4.D-3f) intersectio <br /> n <br /> Impact 4.D-5: <br /> Development • Northbound 1-680 On-ramp from the eastbound M TR 1 Implement TDM Program Significant and <br /> facilitated by the Stoneridge Drive merge(PM Peak Hour) Unavoidable due to <br /> proposed EDZ woulduncertainty about <br /> • Northbound 1-680 On-ramp from the westbound <br /> affect levels of ultimate Caltrans <br /> Stoneridge Drive merge(PM Peak Hour) royal for 1-680, <br /> service for freeway Freeway congestion-relieving improvements including: approval <br /> ramps at • Southbound 1-680 On-ramp from the eastbound second phase of 1-680/1-580 interchange improvements, 580 improvements. <br /> merge/diverge areas Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) 4.D-2 wideningof State Route 84, and otherplanned roadway Funding:Other <br /> within 1-680 under • Southbound 1-680 Off-ramp to Stoneridge Drive diverge system modifications. funding(i.e., not the <br /> Existing plus (AM Peak Hour) City's TIF) <br /> Project conditions. <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.