Laserfiche WebLink
15. Time of Payment of Engineer's Fee "E": Items to be <br />paid for on the basis of Engineer's Fee "E" shall be due and <br />payable to CONSULTING ENGINEER thirty days (30) days from date <br />of invoice. <br /> <br /> 16. Professional Services to be Included in Optional <br />Percentage Fee "F": <br /> <br />Surveying Work <br /> <br />a. Provide field surveys for design. <br />b. Provide field surveys for construction stakes. <br />c. Provide aerial photography to be incorporated as <br /> <br /> part of the construction drawings. <br /> <br />d. Coordinate with utility companies regarding <br /> clearance of existing private utility facilities <br /> and relocation of existing private utility <br /> facilities. <br /> <br />e. Provide survey controls for new street <br /> monumentation. <br /> <br /> <br />