Laserfiche WebLink
17. Determination of Percentage Fee "F": Optional <br />maximum Percentage Fee "F" is determined to be three and one <br />half percent (3-1/2%) of the final contract construction cost. <br />Percentage Fee"F" shall be performed on a Time and Materials <br />basis not to exceed the maximum fee set forth herein. <br />However, in the event work does not proceed to construction, <br />Maximum Fee Limitation "F" will be reduced to one half percent <br />(1/2%) of the estimated construction cost of work designed. <br /> <br /> 18. Time of Payment of Engineer's Optional Fee "F": <br />Items to be paid for on the basis of Engineer's Optional Fee <br />"F" shall be due and payable to CONSULTING ENGINEER thirty <br />(30) days from date of invoice, in accordance with the <br />following schedule: <br /> <br />Progress billings are to be made once each thirty <br />days during the progress of the work; however, <br /> <br />billings shall not exceed ninety percent (90%) <br />of the maximum allowed Percentage Fee "F" until <br />final acceptance of the work. <br /> <br /> 19. Work to be Included in Engineer's Optional Fee "G": <br />Professional services to be performed under Optional <br />Engineer's Fee "G" shall be on a Time and Materials basis not <br />to exceed three percent (3%) of the cost of the final <br />contract construction cost of work to be inspected including <br />any Extra Work which may be ordered by CITY which involves the <br />services of the CONSULTING ENGINEER and shall be based on the <br />following conditions and include the following work: <br /> <br /> <br />