Laserfiche WebLink
13. Time of Payment of Engineer's Fee "D": Items to be <br />paid for on the basis of Engineer's Fee "D" shall be due and <br />payable to CONSULTING FNGINEER thirty (30) days from date of <br />invoice in accordance with the following schedule: <br /> <br /> Progress billings are to be made once each thirty <br /> (30) days during the progress of the work; however, <br /> billings shall not exceed ninety percent (90%) of <br /> the maximum allowed on Percentage Fee "D" until the <br /> construction contract for the work designed is <br /> awarded. <br /> <br /> 14. Engineering Services Included in Unit Price Fee "E": <br />Unit Price Fee "E" is determined to be Five Hundred Dollars <br />($500.00) per each parcel on which an acquisition plat is <br />requested and shall include the following professional <br />services. <br /> <br /> a. Legal description of each parcel, permanent easement <br /> <br /> or temporary construction easement, based on deed <br /> acquisition. <br /> <br /> b- Parcel acquisition plat of each parcel showing all <br /> acquisitions, permanent easements and temporary <br /> construction easements, and in the case of partial <br /> acquisitions, the remainder of the parcel from which <br /> property or easement rights are being required. Plat <br /> size 8 1/2" x 11" or ~ 1/2" x 14" on large parcels. <br /> Remainder not to be shown to scale. <br /> <br /> c. Topography based on aerial photography. (Title <br /> reports necessary for acquisitions to be provided by <br /> CITY). <br /> <br /> <br />