Laserfiche WebLink
Final Construction <br />Cost of Work Designed <br /> <br /> Not Exceeding <br /> <br /> Percent of <br />Cost as Rate for <br />Charges for work* <br /> <br />$ 200,000 8.11 <br />500,000 7.00 <br />1,000,000 6.22 <br />2,000,000 5.70 <br />5,000,000 5.32 <br /> <br />*For amounts not noted, refer to Figure 2, page 29, <br />Manual No. 45. <br /> <br />NOTE: When the actual cost falls between two stated <br />costs on the schedule, the actual percent of cost <br />shall be determined by prorating between the two <br />stated percentages in the same proportion as the <br />actual cost relates to the stated costs per the <br />schedule. Construction cost shall be the cost of <br />facilities designed by CONSULTING ENGINEER and <br />shall not include the cost of facilities designed <br />by CITY or other consultants employed by CITY. <br /> <br /> <br />