My WebLink
|
Help
|
About
|
Sign Out
RES 82362
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2013 12:08:44 PM
Creation date
2/29/2000 7:49:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/14/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
possible Federal Grade Crossing Improvement Funds admin- <br /> istered by the PUC and the California Department of <br /> Transportation. <br /> <br /> 3. Coordinate as necessary with the Federal Highway Admin- <br /> istration in connection with portions Of the Project <br /> which may be funded under Section 203 of the Federal-Aid <br /> Highway Act. <br /> <br /> 4. Coordinate design activities for portions of the Project <br /> which may be designed by AGENCIES. <br /> <br />5. Consult with the Alameda County Flood Control and Water <br /> Conservation Dibtrict with respect to drainage flow <br /> requirements, channel clearances, and alignment required <br /> for affected drainage channels or drains at any of the <br /> separation sites or where new railroad track connections <br /> are proposed. <br /> <br />6. Coordinate as required with public and private utility <br /> agencies whose lines may be affected by the proposed <br /> Project. <br /> <br />7. Maintain continuous liaison with AGENCIES, Railroads, <br /> State, and other interested utility or public agencies. <br /> Submit plans and suitable documentation to applicable <br /> agencies for review and approval. <br /> <br />8. Provide continuing consultation and advice to AGENCIES <br /> on all matters relating to the Project. <br /> <br />9. Present monthly progress reports to AGENCIES and, on <br /> request, participate in presentations before Board of <br /> SuperviSors, City Council, or other public bodies. <br /> <br />B. ENGINEER'S DESIGN RESPONSIBILITIES <br /> <br /> Upon execution of this Agreement by all parties hereto, <br />ENGINEER shall proceed with final design plans, except for <br />those portions of the Project for which AGENCIES reserve <br />the right to perform ~heir own design. <br /> <br />-3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.