My WebLink
|
Help
|
About
|
Sign Out
RES 82446
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 4:20:35 PM
Creation date
2/29/2000 5:52:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert L. Warnick <br />September 16, 1982 <br />Page 4 <br /> <br />CAMP DRESSER & McKEE INC. <br /> <br />Task lO - Prepare Construction Plans, Specifications and Bid Documents <br /> <br />Construction plans will be prepared showing all structural, mechanical, <br />civil and landscape work in detail and in a manner to insure competative <br />bidding between contractors. Detailed specifications will be prepared <br />covering all items of work and materials involved in the construction pro- <br />gram, including hydrostatic testing of the completed reservoir and the work <br />involved in laying pipe from the reservoir to the transmission pipe in <br />Foothill Road. <br /> <br />Phase Three - Construction Services <br /> <br />Task 11 - <br />Task 12 - <br />Task 13 - <br />Task 14 - <br />Task 15 - <br />Task 16 ~ <br />Task 17 ~ <br />Task 1B - <br />Task 19 - <br />Task 20 - <br /> <br />Respond to Bid Inquiries <br /> <br />Assist in the Evaluation of Construction Bids <br /> <br />Participate in Preconstruction Conference <br /> <br />Shop Drawing Review <br /> <br />Assistance with Change Orders <br /> <br />Liaison with City Staff <br /> <br />Periodic Inspection <br /> <br />Witness Reservoir Testing <br /> <br />Final Inspection and Certification <br /> <br />Prepare As-built Drawings <br /> <br />FEE <br /> <br />The work described can be performed for the following fees: <br /> <br />Phase One - <br /> <br />Investigation <br /> <br />(a} Basic Reservoir Services $ 12,000 <br />(b) Geotechnical Analysis 4,000 <br /> <br /> Total $16,000 <br /> <br />Phase Two - <br /> <br />Design <br /> <br /> (To be estimated at the conclusion of Phase One) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.