My WebLink
|
Help
|
About
|
Sign Out
RES 82446
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 4:20:35 PM
Creation date
2/29/2000 5:52:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert L. Warnick <br />September 16, 1982 <br />Page 5 <br /> <br />CAMP DRESSER & McKEE INC, <br /> <br />Phase Three - Construction Services <br /> <br /> (To be estimated at the conclusion of Phase Two) <br /> <br />It is proposed that the firm of ENGEO, Inc. perform the geotechnical <br />services as a subcontractor to CDM. ENGEO has considerable reservoir expe- <br />rience and their personnel were closely involved with two of the previous <br />soils and geotechnical studies for the Foothill Reservoir. <br /> <br />SCHEDULE <br /> <br />We can begin work within one week and can perform the Phase One services as <br />indicated herein within three months. If necessary, the work could be ac- <br />complished in a shorter period. <br /> <br />CONCLUSION <br /> <br />We are looking forward to the opportunity to perform the services described <br />in this proposal. We are available to meet with you and other members of <br />the City staff to answer a~y questions that you may have about the propo- <br />sal. <br /> <br />Respectfully submitted, <br /> <br />/RES~ER~.cK.EE~INC. <br /> <br />RGF:sjh <br /> <br />cc: Bissell and Karn <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.