My WebLink
|
Help
|
About
|
Sign Out
RES 83307
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:00:29 PM
Creation date
2/3/2000 12:31:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/26/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
personnel perform installation tests when the CENTREX is deliv- <br />ered for Central Office installation. The System is unpacked <br />and inspected for possible damage during shipment. Manual and <br />automated tests involving the CENTREX are performed. Auy <br />problems discovered at this time are documented by Pacific <br />Telephone and Western Electric Company personnel for analysis. <br /> <br />Evaluating for reliability completes the sturdy reliability <br />structure of every CENTREX. Such evaluation takes place during <br />each phase of the CENTREX's life cycle. <br /> <br />RELIABILITY DATA <br />During system design, engineers evaluate existing data on com- <br />ponent reliability to help in disign decisions. <br /> <br />New data is generated by the many testing procedures that occur <br />during development, production, and installation. <br /> <br />After installation, actual performance data from working CEN- <br />TREXes is collected and evaluated. This field data has two <br />major sources. <br /> <br />First, each CENTREX generates its own reliability data by log- <br />ging self-diagnosed error information. The data from the <br />CENTREX's self-diagnostic and maintenance activities is tracked <br />and accessed by Pacific Telephone personnel. <br /> <br />When a component in a track system fails, the failure is docu- <br />mented, and the failed part is replaced and sent to Bell <br />Laboratories for analysis. Sophisticated testing equipment is <br />used to analyze the failure. Evaluation of the data generated <br />by this survey may suggest product refinements that will result <br />in even greater reliability. <br /> <br />Product Cost - See Section IV for costs on CENTREX. When consider- <br />ing the costs for CENTREX, the City of Pleasanton should remember: <br /> - ability to use present station equipment. <br /> - space efficiency - the costly space consumed by most competi- <br /> tive systems is now free. <br /> environmental controls - eliminate the expenditure for <br /> expensive, dedicated environmental controls. <br /> - power back-up - provided by Pacific Telephone at no extra <br /> charge to the customer. <br /> <br />Site Preparation Cost - Because CENTREX is housed on Pacific <br />Telephone property, there are no costs to the City of Pleasanton <br />for floor space, air conditioning, or electricity to operate the <br />system. No other vendor can make this claim. <br /> <br /> PROPOSAL CONTRACT FOR~T <br />A. System Description <br /> 1. Equipment - See Section IX, <br /> 2. Operation - See Section IX. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.