My WebLink
|
Help
|
About
|
Sign Out
RES 83145
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2012 4:28:06 PM
Creation date
2/2/2000 12:33:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/12/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 3- <br /> <br />to be based upon the final total payment made to contractor for <br />construction of the 12-inch water line and telemetry conduit. <br /> <br /> B. ZONE 7 agrees to allow CITY to administer and construct all work <br />associated with the dredging and removal of material from the Arroyo Mocho. <br />In furtherance thereof, ZONE 7 agrees to do the following: <br /> <br />Submit to CITY for incorporation into Project the design <br />plans and specifications for the dredging and removal of <br />material from the Arroyo Mocho. <br /> <br />2. Inspect the construction as required unless this function <br /> is delegated to CITY. <br /> <br />Pay the CITY, upon billing, for the full cost (100%) of <br />removal of the material from the Arroyo Mocho. Bids for the <br />above work shall he submitted to ZONE 7 for approval by its <br />General Manager pr$or to award of construction contract, <br /> <br />Costs will be based upon the final total payment to contractor <br />for this item. <br /> <br /> C. ZONE 7 agrees to pay the CITY, upon billing, for 100% design and <br />construction of sealing Well No. 3 and Well No. 5. Well No. 5 is a ZONE 7 <br />facility located approximately 750 feet northeasterly of Well No. 4. Design <br />costs to be based on Exhibit "B" and construction costs based on final total <br />payment to contractor for this item. Bids for the above work shall be submitted <br />to ZONE 7 for approval by its General Manager prior to award of construction <br /> <br />contract. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.