My WebLink
|
Help
|
About
|
Sign Out
RES 83145
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2012 4:28:06 PM
Creation date
2/2/2000 12:33:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/12/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 2 - <br /> <br /> ~EREAS, it is to the mutual benefit of CITY and ZONE 7 to carry out <br />certain work efforts on a cooperative basis; <br /> <br /> NOW, THEREFORE, based on the foregoing mutual understandings, ZONt 7 <br />and CITY agree as follows: <br /> <br />I. Responsibility of ZONE 7 <br /> <br /> A. ZONE 7 agrees to allow CITY to design, administer and construct a <br /> <br />12-inch ductile iron pipe water line to replace an existing ZO~ 7 8-inch <br />above-ground steel pipeline and a telemetry conduit within the same trench. <br />Said lines shall be located within the same easement as the existing 8-inch <br />pipeline from Well No. 3 to Well No. 4, as shown on attached map (Exhibit "A"). <br />The existing 8-inch pipeline shall be removed upon acceptance of new 12-inch <br /> <br />water line. <br /> <br />In furtherance thereof, ZONE 7 agrees to do the following: <br /> <br />Review and approve water line and telemetry conduit plans and <br />specifications. <br /> <br />2. Inspect the construction of water line and telemetry conduit <br /> unless this function is delegated to CITY. <br /> <br />Pay the CITY, upon billing, for two-thirds the cost of design <br />and construction of said 12-inch water line and for the full <br />cost (100%) of design and construction of the telemetry conduit. <br />Design costs are to be based upon CITY's agreement with their <br />design consultant, Ruth and Going, Inc., dated June 8, 1982 <br />(Exhibit "B," Section IV.A., pg. 4). Bids for the above work <br />shall be submitted to ZONE 7 for approval by its General Manager <br />prior to award of c~nstruction contract. Construction costs are <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.