My WebLink
|
Help
|
About
|
Sign Out
RES 84540
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2012 4:04:17 PM
Creation date
1/27/2000 10:56:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/30/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the lowest acceptable construction bid exceeds <br />the budgeted cost of construction by more than <br />t5%, and CITY elects not to approve the excess <br />or to reject all bids and either rebid or nego- <br />tiate, then CONSULTANT shall, upon request of <br />the CITY, revise the drawings and specifications <br />~jithout additional charge so as to obtain an <br />acceptable bid within 15% of the fixed budget <br />limit of construction. CITY will cooperate with <br />CONSULTANT in order to effect such reduction. <br />CONSULTACIT shall have the option of including <br />alternate bid items, additive items or deduct <br />items acceptable to CITY so as to permit flex- <br />ibility in accepting a bid within the budgeted <br />construction limit. <br /> <br />If upon completion of the work described above, <br />and the award of construction contract is delayed <br />for more than three (3) months after CONSULTANT'S <br />submission of the revised working drawings and <br />specifications and estimates, CITY shall have the <br />option to: <br /> <br /> a. increase the construction budget; or <br /> <br /> b. Authorize CONSULTANT to furnish addi- <br /> tional alternate bid items, CONSULTANT'S <br /> compensation for which shall be on an <br /> Extra Work basis; or <br /> <br /> c. Authorize CONSULTANT to redesign to <br /> bring PROJECT within the budget, CON- <br /> SULTANT'S compensation for which shall <br /> be on an Extra Work basis; or <br /> <br /> d. Cancel agreement as per Section VII. <br /> <br />Both options (b) and (c) above shall be consi- <br />dered Extra Work and paid for on a Time-and- <br />ICaterials basis in accordance with section I.D. <br /> <br />-8- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.