Laserfiche WebLink
5. <br /> <br />6. <br />7. <br /> <br />Conduct topographic survey and prepare map of <br />topography and existing facilities. <br /> <br />Develop refined schematic plans. <br /> <br />Prepare detailed cost estimate and breakdown. <br />Prioritize project elements and define options. <br />Present schematic master plan and report with <br />cost estimate and reco~nendations to City for <br />selection of final project scope. <br /> <br />WOPd(ING DRAWING PI~JlSE <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />Prepare and furnish complete working drawings, <br />based upon the Scheme and Scope of Work selected <br />by City. <br /> <br />Prepare and furnish final specifications. <br /> <br />Prepare and furnish bidding documents. <br /> <br />Prepare and furnish final cost estimate. <br /> <br />Provide thirty (30) complete sets of drawings <br />and specifications. <br /> <br />Provide sepia mylar originals of the construction <br />document set. <br /> <br />C. Construction Phase <br /> <br />Perform field construction staking. <br />Perform review of contractors submittals and <br />shop drawings. <br />Perform routine consultation during construction <br />on request of City for plan interpretation and <br />processing of routine Change Orders. <br /> <br />D. Extra Work <br /> <br />Perform any work requested by City beyond the <br />of services hereinabove defined, <br /> <br />-2- <br /> <br />scope <br /> <br /> <br />