Laserfiche WebLink
8/22/84 <br /> <br />Task 10 - <br /> <br />Task 11 - <br /> <br />Task 12 - <br /> <br />Task 13 - <br /> <br />3. Depth to diameter design criteria <br /> <br />4. Infiltration/Inflow factors <br /> <br />Modify as appropriate <br /> <br />Calibrate Model <br /> <br />A. Run existing collection system model <br /> <br />B. Debug data input <br /> <br />C. Compare model results to actual flow data <br /> <br />D. Adjust flow coefficients as appropriate <br /> <br />Perform Existing System Analysis <br /> <br />A. Run existing system model <br /> <br />B. Identify any apparent existing system capacity constraints <br /> and deficiencies <br /> <br />C. Determine facilities required to correct <br /> <br />D. Locate constraints or deficiencies on existing pipeline <br /> system atlas <br /> <br />Ultimate Land Use Analysis <br /> <br />A. Run system model with land use data upon build-out of <br /> the General Plan developed in Task 5 <br /> <br />B. Identify ultimate system capacity constraints <br /> <br />C. Determine facilities required to correct <br /> <br />D. Locate constraints or deficiencies on existing system <br /> atlas <br /> <br /> Intermediate Land Use Analysis <br /> <br />A. Run system model with intermediate land use (5 year <br /> or 10 year) data <br /> <br />B. Identify capacity constraints <br /> <br />C. Determine facilities required to correct <br /> <br />D. Locate constraints or deficiencies on existing system <br /> atlas <br /> <br /> <br />