Laserfiche WebLink
8/22/84 <br /> <br />Task 14 - <br /> <br />Task 15 - <br /> <br />Task 16 - <br /> <br />Task 17 - <br /> <br />Evaluate System Efficiency <br /> <br />Review existing lift or pump station locations and <br />pipeline invert inlet elevations <br /> <br />Evaluate ability to eliminate lift or pump stations <br />by re-routing flows <br /> <br />NOTE: <br /> <br />Special consideration should be given <br />if ultimate land use analysis identifies <br />major system improvements. <br /> <br />Evaluate impact on collection system for alternative <br />flow configurations <br /> <br />Prepare Capital Improvement Program <br /> <br />A. Develop recommendations for phased capital improvements <br />B. Prepare cost estimates <br /> <br />Identify Infiltration/Inflow Program <br /> <br />A. Based on information obtained during the study, identify <br /> a program to systematically evaluate and reduce I/I. The <br /> program would likely inclu-e consideration of the following: <br /> <br /> 1. Gross level monitoring <br /> <br /> 2. Smoke testing <br /> <br /> 3. Monitoring prior to joint repair <br /> <br /> 4. Post repair monitoring <br /> <br /> 5. Cost effective analysis. <br /> <br /> 6. Schedule for phasing work above <br /> <br /> NOTE: This work plan includes only definition <br /> of a proposed program. <br /> <br />B. Develop recommendations for proceeding <br /> <br />Prepare Draft Report <br /> <br />A. Prepare outline of report content and review with <br /> City staff <br /> <br /> <br />