Laserfiche WebLink
8/22/84 <br /> <br />Task 6 - <br /> <br />Task 7 - <br /> <br />Task 8 - <br /> <br />Task 9 - <br /> <br />Obtain land use data from Gruen Gruen + Associates <br />for future subareas <br /> <br />Identify input locations <br /> <br />Format and Input Data <br /> <br />A. Format land use and pipeline data for input into <br /> computer <br /> <br />B. Input data <br /> <br /> Flow Monitoring and Data Collection <br /> <br />A. Obtain existing pump station flow data or other <br /> available flow data <br /> <br />B. Identify locations for additional wastewater flow <br /> monitoring. Assumes meters, recorders and primary <br /> devices are available through DSRSD. (Approximately <br /> 4 locations for 1 week each) <br /> <br />C. Assist City staff install and remove metering devices. <br /> (City staff to enter manholes, install devices and <br /> provide daily check of metering and recording instruments.) <br /> Lowry staff to provide all metering equipment <br /> <br /> D. Reduce flow data obtained <br /> <br /> Develop Flow Coefficients <br /> <br />A. Based on flow data obtained from Task 7 and other <br /> available information (i.e., data from the Brown and <br /> Caldwell water conservation study) <br /> <br />B. Information available from preliminary study of the <br /> East Amador Trunk Sewer <br /> <br /> C. Review coefficients with City staff and modify or <br /> add ocefficients as determined appropriate <br /> <br />Develop Design Criteria <br /> <br />A. Review criteria used for East Amador Trunk Sewer <br /> analysis with City staff, including the following: <br /> <br /> 1. Minimum velocities <br /> <br /> 2. Peak to average relationships <br /> <br /> <br />