My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
060209
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2009 1:37:31 PM
Creation date
5/29/2009 1:35:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/2/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 Pending Repair List <br />The Contractor shall provide a computerized monthly report, to the City Traffic Engineering <br />Division of the Community Development Department by the fifteenth day of each month, of all <br />pending repair work needed at each intersection. This report shall be broken down by intersection <br />and be separate from the Monthly Activity Report. <br />If the contractor does not provide the computerized monthly activity report by the fifteenth day, the <br />Contractor shall pay liquidated damages to the City in the amount of$500 per calendar day until the <br />report is submitted. <br />6. MEETINGS <br />The Contractor's technician shall be available to meet with the City Traffic Engineering Division on <br />a weekly basis at a mutually agreed upon time and place in the City of Pleasanton to review each <br />week's maintenance activities. The Contractor's maintenance supervisor shall be similarly available <br />to meet with the City Traffic Engineering Division on a monthly basis. <br />7. KEY PERSONNEL <br />Any and all persons identified in this Agreement performing work hereunder are deemed by CITY to <br />be key personnel whose services were a material inducement to CITY to enter into this Agreement, <br />and without whose services CITY would not have entered into this Agreement. CONTRACTOR <br />shall not remove, replace, substitute, or otherwise change any key personnel without the prior written <br />consent of CITY. <br />8. COMPENSATION <br />8.1 Compensation for Routine Maintenance <br />In consideration of the furnishing by the Contractor of the described labor, services, materials and <br />equipment in accordance with all provisions of this Agreement, together with the appurtenances <br />thereto, said Contractor shall be paid by the City sum of S per maintained intersection <br />per month as the flat rate cost in accordance with Page 5 "Proposal Price Comparison" of the <br />Request for Proposals, attached and incorporated by reference as though fully set forth herein. <br />In the event that new signals arc installed, the Contractor agrees to maintain these signals at the same <br />flat rate and in the same manner as those covered by this Agreement upon written notification from <br />the City Traffic Engineering Division. In the event notification is made at other than the beginning of <br />the monthly contract period, payment for that month shall be prorated on a daily basis. <br />Traffic Signal Maintenance Contract <br />Attachment 3 Scope of Work <br />Contract No. <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.