Laserfiche WebLink
the City Traffic Engineering Division on semi- annual basis, sec Attachment 4— Preventative <br />Maintenance Schedule. <br />(b) Preventive Maintenance (PM) Checklist: The Contractor shall create and provide a MS <br />Access or approved equal database with data entry forms for the field technicians to use to <br />log preventative maintenance and emergency call -out activity. The Contractor shall maintain <br />this database for use by maintenance staff whenever they visit any signalized intersection. <br />The Contractor shall also maintain a hardcopy of the Preventive Maintenance Checklist Form <br />at each intersection. The PM checklist form in the cabinet shall he completely filled out. The <br />database shall be accessible via a wireless PDA or similar technology so that the technician <br />may update the database from the intersection. Every time the signal cabinet door is opened, <br />the maintenance technician shall make an entry in the maintenance database regarding the <br />purpose of the maintenance activity and operational status of the signal. The database forms <br />shall be used by the maintenance staff to record each Preventative Maintenance inspection <br />and any non scheduled maintenance activity by the Contractor to repair an clement of the <br />traffic signal installation at the intersection (cabinet components, detector loops, pedestrian <br />heads, signal heads, lenses, signal poles, etc.). The PM database shall be continually updated. <br />The City shall have access to the database via the Internet as well as have an updated hard <br />copy of the database provided to them be furnished to the City Traffic Engineering Division <br />monthly. <br />5.2 Monthly Activity Report <br />The Contractor shall provide a computerized monthly activity report to the City Traffic Engineering <br />Division of the Community Development Department by the fifteenth day of each month for the <br />previous month. The report shall be mailed or delivered on a CD in the Microsoft database format <br />and shall include the following: <br />a. Time the service calls were received by Contractor, City personnel making the call, <br />time arrived at the intersection, the response time, the technician name, the number of <br />hours spent for each repair and equipment replaced. <br />b. A complete record of all work that was performed on the City traffic signal <br />equipment during the previous month including the make, model, and serial number <br />of any major components or other equipment that was newly installed at each <br />intersection. The disposition of removed signal control components and the repair <br />history of reinstalled components shall be included in the monthly report. <br />c. Time and date the PM work was performed. <br />If the contractor does not provide the computerized monthly activity report by the fifteenth day, the <br />Contractor shall pay liquidated damages to the City in the amount of S500 per calendar day until the <br />report is submitted. <br />Traffic Signal Maintenance Contract Contract No. <br />Attachment 3 Scope of Work Page 8 <br />