Laserfiche WebLink
9. That the developer design and construct, to the <br />satisfaction of the City Engineer, full public <br />street improvements for the eastern one -half of the <br />proposed 84 ft. wide street extension from Bernal <br />Avenue south to the south property line of the <br />subject development. These improvements shall <br />include, but are not necessarily limited to <br />grading, 8 in. P.C.C. vertical curb and gutter, an <br />8 ft. wide P.C.C. sidewalk, 30.5 ft. width of <br />structural pavement, A.C. berm, additional <br />structural pavement to provide for a 14 ft. wide <br />transition lane at the Bernal Avenue intersection, <br />a storm drain system, a sanitary sewer system, a <br />water main and facilities, street lighting, <br />underground utilities, traffic control devices, <br />landscaping and automatic irrigation systems. The <br />improvements shall generally be as shown on the <br />attached Figure 1, unless otherwise approved by the <br />City Engineer. These improvements shall be <br />installed at the time of initial construction of <br />this development and shall be completed prior to <br />any occupancy of any building on this site. <br />10. That the developer construct an 8 ft. wide, <br />(minimum) P.C.C., meandering sidewalk between the <br />facie of curb and the south line of the 20 ft. <br />P.S.E. across the entire Bernal Avenue frontage of <br />the development. <br />11. <br />That the developer grant, or cause to be granted, a <br />temporary, 10 ft. wide public service easement <br />(PSE) west of, parallel with, and contiguous to the <br />western edge of the proposed one -half street along <br />it's entire length for public street construction <br />purposes. This easement will be quitclaimed when <br />the western one -half of the street is constructed. <br />8. That the developer dedicate, or cause to be <br />dedicated, to the City for street right -of -way <br />purposes, a 20 ft. wide public service easement <br />(P.S.E.) parallel with and contiguous to the Bernal <br />Avenue frontage of the development. <br />That the developer complete the design and <br />construction of any portions of the south one -half <br />of [3ernai Avenue which have not been completed by <br />the City in con with the Railroad <br />Consolidation project or the Bernal Avenue -Sunol <br />Boulevard C.I.P. <br />12. That the developer pay an in -lieu fee for a portion <br />of the cost of a traffic signal at the intersection <br />of Bernal Avenue and the proposed 84 ft. wide <br />street. The developer's proportionate share shall <br />be duterm.ined by the City Engineer based on <br />projected traffic volumes. <br />