My WebLink
|
Help
|
About
|
Sign Out
RES 84358
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84358
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 3:30:46 PM
Creation date
1/26/2000 9:41:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/24/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Subject to the conditions hereinafter provided, PGandE is <br />willing to complete the installation of the Electric Facilities by using <br />all or a portion of the Electric Substructures as shown on Exhibit "A," <br />when detailed knowledge of the exact loads or service locations within <br />Tract 4788 in the District are made kn~>wn to PGandE. <br /> <br /> 8. All of the Electric Facilities and part of the Street Lighting <br />Service Facilities to be installed within the District will be constructed <br />by PGandEo <br /> <br /> 9. The ownershit} of the Electric and Street Lighting Service <br />Facilities installed by PGandE shall vest in PGandE in accordance with pro- <br />visions of Sections 10109, lOllO and lOlll of the Streets and Highways Code <br />of the State of California. <br /> <br /> NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS: <br /> <br /> I. Electric Substructures and Electric and Street Lighting z <br /> Service Facilities <br /> <br /> A. Prior to receipt by PGandE of applications to serve any <br />electric load, Developer shall furnish and install certain Electric Sub- <br />structures shown on Exhibit "A" in accordance with PGandE's Engineering <br />Standard No. 99, copy attached, and convey the Electric Substructures as <br />provided in Section II.F. hereunder, in advance of any construction work <br />by PGandE. The estimated value of such Electric Substructures, excluding <br />those substructures described in paragraph I.B. below, i~"~t43~ This <br />amount may be subject to refund as provided in the present electric exten- <br />sion rule and subject to the provisions of Section I.N. below. However, <br />refunds, if any, contemplated under this agreement will be subject to the <br />applicable rule in effect at the time of utilization, as provided in <br />Section I.K. of this agreement. <br /> <br />3: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.