My WebLink
|
Help
|
About
|
Sign Out
RES 84358
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84358
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 3:30:46 PM
Creation date
1/26/2000 9:41:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/24/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q. In accordance with the Class C rates of Schedule LS-1. <br /> or such other schedules as may hereafter be applicable for service to such <br /> a street lighting system, City shall be responsible for the monthly service <br /> charge for all street lighting, including the continuing additional monthly <br /> payment for the special equipment furnished by PGandE. <br /> <br /> I~. General Tern~s and Conditions <br /> <br /> A. PGandE will not be required to make electric refunds <br />hereunder until all additional charges which may become due under <br />Section I~.D. hav~ bF~ determined~ ~n~ PGandE maF, at its option. apply <br />an.,~ vefu~ld', which ma,7 becom~ due against such charges. <br /> <br /> B. For engi~eerin9 reasons. transformers and switch <br />}nstallations may be surface mounted. The transformer required for the <br />street lighting service facilities is to be subsurface mounted. <br /> <br /> C. City and Developer agree that in any transaction for the <br />sale or lease of property within Tract 4788 in the District, they will <br />reserve the right to grant to PGandE all necessary permanent rights of way <br />and easements for the Electric and Street Lighting Service Facilities and <br />Electric Substructures. <br /> <br /> D. It is expressly understood and agreed that as the actual <br />construction in Tract 4788 within the District takes place. PGandE may make <br />changes {~r ~ed~fications to that pt)rtk}~'~ 6f the then unoccu~ied portion of <br />the Electric Substructures as shown on Exhibit "A" that PGandE determines <br />in its sole discretion are required to provide adequate service therein. and <br />snch changes or modifications shall not be deemed a mater~al departure from <br />this agreement and Developer and its successors in interest shall be and <br />~e~ain obligated to pay ~or the completion o~ the Electric Substructures as <br />~) ~o(}if~e~; ~rov~ded, how~e,. that ~evelupeF shall ~ot be obligated to <br /> <br /> 8: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.