My WebLink
|
Help
|
About
|
Sign Out
RES 09265
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2009
>
RES 09265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2009 12:50:46 PM
Creation date
3/27/2009 12:49:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 09265
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft EIR, page 3.2-19.) Mobile, area and indirect source generation rates <br />will be the same with the Concurrent Extension because the number of <br />vehicle trips generated and uses conducted by the Project will be the <br />same. Greenhouse gas impacts therefore will be the same with the <br />Concurrent Extension. The Concurrent Extension may change traffic <br />patterns through the Project site at an earlier date, but, relative to the <br />Deferred Extension, it does not cause the absolute number of mobile <br />sources contributing to greenhouse gas impacts to increase. <br />Biological Resources <br />Findings Regarding Significant Impacts <br />1. Impact on the California red-legged frog <br />Finding. The City finds that the following mitigation measures are feasible and <br />have been incorporated into the MMRP, thereby mitigating the impact <br />to ales-than-significant level: <br />Conduct preconstruction surveys for the California red- <br />legged frog, per MM BIO-2.1. <br />Implement ground disturbance restrictions associated with <br />construction near the Arroyo Mocho, per MM BIO-2.2. <br />Conduct construction monitoring for the California red- <br />legged frog, per MM BIO-2.3. <br />Conduct Worker Environmental Awareness Program <br />(WEAP) training for construction crews before construction <br />activities within the Arroyo Mocho begin, per MM BIO-2.4. <br />DEIR, p. 3.3-17 <br />2. Impact on the California tiger salamander <br />Finding. The City finds that the following mitigation measures are feasible and <br />have been incorporated into the MMRP, thereby mitigating the impact <br />to aless-than-significant level: <br />Complete ongoing California tiger salamander surveys and, <br />if salamanders are found, comply with USFWS mitigation <br />measures, per MM BIO-3.1. <br />Provide construction monitoring for the California tiger <br />salamander, if surveys identify salamanders on the Staples <br />Ranch site, per MM BIO-3.2. <br />DEIR, p. 3.3-20 <br />Stoneridge Drive Specific Plan Amendment and Staples Ranch Project <br />Environmental Impact Report Findings and Statement of Overriding Considerations Page 20 of 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.